OSHA Inspection: JHADSON TENESACA

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of JHADSON TENESACA in BRANDYWINE SENIOR LIVING 311 ROUTE 73, VOORHEES, NJ 08043 (NAICS 238140). OSHA activity number 338206824.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Jhadson Tenesaca — free Get an email when a new federal OSHA severe-injury report for Jhadson Tenesaca is published. One employer, no account, unsubscribe in one click.
Establishment
JHADSON TENESACA
Site address
BRANDYWINE SENIOR LIVING 311 ROUTE 73
City
VOORHEES
State
NJ
ZIP
08043
Mailing
6606 WOODSIDE AVE, NEW YORK CITY, NY 10259
Inspection type
Unprogrammed Related (G)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
6
Ownership type
A

14 citations on file for this inspection.

1926.451 B01

Serious Gravity 10 2 instances 6 exposed
Issued
May 17, 2013
Abate by
May 23, 2013
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii)  (a) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, SW Wing, Exterior: The third scaffold section over from the left, third level high was not fully planked. The platform was missing a plank. An employee was installing insulation from the scaffold approximately 18 feet above grade, observed on or about 1/2/13.  (b) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, Pod, and 2nd Floor Deck: The scaffold erected on the 2nd floor deck of the pod was not fully planked, the platform was missing a plank. An employee was installing insulation off the scaffold, approximately 6 feet from the deck, and 18 feet above grade, observed on or about 1/31/13:  NOTE:  IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (1)
  • — Z (S) $2800

1926.451 B03

Serious Gravity 10 2 instances 6 exposed
Issued
May 17, 2013
Abate by
May 23, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.451(b)(3): The front edge of all platforms was not 14 inches (36 cm) or less from the face of the work, and no guardrail systems were erected along the front edge and/or no personal fall arrest systems were used in accordance with paragraph (g) of this section to protect employees from falling. Note:  See exceptions in paragraphs (b)(3)(i) and (ii) of this section.  (a) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, SW Wing Exterior: An employee was observed working from the cross braces located 29 inches from the structure, no fall protection was provided, observed on or about 1/02/13:  (b) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, Rear Deck of POD: An employee was observed working from the cross braces and front edge of the top platform,  located 29 inches from the structure, observed on or about 1/31/13:  NOTE:  IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (1)
  • — Z (S) $0

1926.451 C02

Serious Gravity 10 1 instance 6 exposed
Issued
May 17, 2013
Abate by
May 23, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames,  or uprights did not bear on base plates, mud sills or other adequate firm foundation:  (a) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, and SW Wing Exterior: An employee was observed working from a scaffold that was not fully supported. The base plate of the scaffold was half off a wooden board that had been placed upon two concrete blocks, observed on or about 1/02/13:   NOTE:  IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (1)
  • — Z (S) $0

1926.451 E09 IV

Serious Gravity 10 3 instances 3 exposed
Issued
May 17, 2013
Abate by
May 23, 2013
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.451(e)(9)(iv): Cross braces on tubular welded frame scaffolds were used as a means of access or egress.  (a) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, and SW Wing: An employee climbed the cross braces while erecting the scaffold, observed on or about 1/2/13.   (b) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, SW Wing:  A ladder was not provided for the employee to use.  The employee was erectingscaffold from the 3rd level side bracket.  The employee climbed the cross braces to get to that side bracket, observed on or about 1/31/13.  (c) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, Exterior Pool Room Wall: The ladder provided for use was only used to access the first level of the scaffold. The employee climbed the crossbraces to access the 2nd and 3rd levels, observed on or about 2/22/13.   NOTE:  IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (1)
  • — Z (S) $2800

1926.451 G02

Serious Gravity 10 1 instance 1 exposed
Issued
May 17, 2013
Abate by
May 23, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(2): The employer did not provide fall protection for employees erecting or dismantling supported scaffolds:  (a) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, SW Wing Front: An employee was erecting a scaffold without the use of fall protection, approximatley 19 feet above grade, working from the third level side bracket. The scaffold system was not fully planked or provided with guardrails,  observed on or about 1/31/13.  NOTE:  IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (1)
  • — Z (S) $0

1926.501 B01

Serious Gravity 10 1 instance 6 exposed
Issued
May 17, 2013
Abate by
May 23, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems.  (a) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, Pod, 2nd Floor Deck: Employees were working on the edge of the deck of the second level, approximatley 12 feet above the lower level, without the use of fall protection, observed on or about 1/31/13.  NOTE:  IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (1)
  • — Z (S) $0

1926.1053 B01

Serious Gravity 5 2 instances 6 exposed
Issued
May 17, 2013
Abate by
May 17, 2013
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.1053(b)(1): Portable ladders were used for access to an upper landing surface and the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface to which the ladder was used to gain access  (a) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, SW Wing Front: Employees accessed the second level of the scaffold with a ladder that extended 2 feet 6 inches above the point of access, observed on or about 1/2/13.
Recent events (1)
  • — Z (S) $2000

1926.1053 B09

Serious Gravity 5 1 instance 6 exposed
Issued
May 17, 2013
Abate by
May 23, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.1053(b)(9): The area around the top and/or bottom of (a) ladder(s) was not kept clear:  (a) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, and SW Wing Exterior: The area around the base of the ladder was not kept clear. Debris including but not limited to bricks, wood and insulation cluttered the area, observed on or about 1/2/13.  NOTE:  THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM, FAILURE TO DO SO WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 AS PER 29 CFR 1903.19.
Recent events (1)
  • — Z (S) $0

1926.1053 B21

Serious Gravity 5 1 instance 2 exposed
Issued
May 17, 2013
Abate by
May 23, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.1053(b)(21): Employees were not grasping the ladder with at least one hand when progressing up and/or down the ladder:  (a) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, Exterior Pool Room Wall:  Two employees were observed descending the ladder with equipment in their hands unable to grasp the ladder with at least one hand, unable to maintain at least 3 points of contact, observed on or about 2/22/13.  NOTE:  THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM, FAILURE TO DO SO WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 AS PER 29 CFR 1903.19.
Recent events (1)
  • — Z (S) $0

1926.451 B02

Willful Gravity 10 3 instances 2 exposed
Issued
May 17, 2013
Abate by
May 23, 2013
Penalty
Initial $14,000 · Current $14,000
29 CFR 1926.451(b)(2): Scaffold platforms and walkways were not at least 18 inches wide:  (a) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, SW Wing Front: An employee was using a cross brace as a scaffold platform approximately 15 feet above the next lower level, observed on or about 1/2/13.  (b) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, SW Front: An employee was using a cross brace as a scaffold platform approximately 18 feet above the next lower level, observed on or about 1/5/13.  (c) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, Pod Rear Deck: An employee was using a cross brace as a scaffold platform approximately 4 feet above the next lower level, observed on or about 1/31/13.  NOTE:  IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (1)
  • — Z (W) $14000

1926.452 C05 III

Willful Gravity 5 6 instances 6 exposed
Issued
May 17, 2013
Abate by
May 23, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.452(c)(5)(iii): Brackets used to support cantilevered loads shall be used only to support personnel, unless the scaffold has been designed for other loads by a qualified engineer and built to withstand the tipping forces caused by those other loads being placed on the bracket-supported section of the scaffold.  (a) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, SW Wing East Side: The side brackets on the scaffold were used to support the bucket of mortar and other material, second level up. Materials were stored on the side brackets that were installed on the opposite side from where the work was actually being performed, observed on or about 1/2/13.  (b) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, Near Front entrance: The side brackets on the scaffold were used to support the bucket of mortar and other material, one level up. Materials were stored on the side brackets that were installed on the opposite side from where the work was actually being performed, observed on or about 1/2/13.  (c) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, POD SW Section Faciing Route 73: The side brackets on the scaffold were used to support the bucket of mortar and other material, one level up. Materials were stored on the side brackets that were installed on the opposite side from where the work was actually being performed, observed on or about 1/2/13.  (d) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, SW Wing East Side: The side brackets on the scaffold were used to support the bucket of mortar and other material, third level up. Materials were stored on the side brackets that were installed on the opposite side from where the work was actually being performed, observed on or about 1/3/13.  (e) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, SW Wing Near the Entrance: The side brackets on the scaffold were used to support the bucket of mortar, two levels up. Materials were stored on the side brackets that were installed on the opposite side from where the work was actually being performed, observed on or about 1/3/13.  (f) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, Exterior Wall of Pool Area: The side brackets on the scaffold were used to support the bucket of mortar, two levels up. Materials were stored on the side brackets that were installed on the opposite side from where the work was actually being performed, observed on or about 2/22/13.  NOTE:  IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (1)
  • — Z (W) $0

1926.451 E01

Willful Gravity 10 7 instances 3 exposed
Issued
May 17, 2013
Abate by
May 23, 2013
Penalty
Initial $14,000 · Current $14,000
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.  Cross braces were used as a means of access.  (a)    Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, and SW Wing: The access ladder only went up to the second platform, employees climbed the cross braces and end frames  to access the third level of the scaffold system, observed on or about 1/2/13.    (b)   Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, Front of Building Side Entrance was on: The scaffold system was not provided with a ladder; employees climbed the cross braces and end frames  to access the scaffold system, observed on or about 1/2/13.    (c)    Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, SW Pod: A ladder was not provided for employees to use to access the scaffold, employees climbed the cross braces and end frames to access, observed on or about  1/2/13.    (d)   Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, Front of Building Side Entrance was on: The scaffold system was not provided with a ladder; employees climbed the cross braces and end frames  to access the scaffold system, observed on or about 1/3/13.    (e)   Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, and SW Wing: The access ladder only went up to the second platform, employees climbed the cross braces and end frames to access the third level of the scaffold system, observed on or about 1/5/13.    (f)     Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, POD Back Deck:  A ladder was not provided for employees to use to access the side bracket or the top level of the scaffold, employees climbed the cross braces and end frames to access, observed on or about 1/31/13.       (g)   Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, Exterior Pool Room Wall:  The ladder was only elevated to the 1st level of the scaffold system.  Employees were working on the second and third levels of the scaffold system and used the cross braces to access those levels, observed on or about 2/22/13.   NOTE:  IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (1)
  • — Z (W) $14000

1926.451 G04 I

Willful Gravity 10 7 instances 6 exposed
Issued
May 17, 2013
Abate by
May 23, 2013
Penalty
Initial $14,000 · Current $14,000
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms.  (a) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, SW Wing Front: Employees were working on a scaffold system that was not provided with end-rails, approximatley 19 feet six inches above grade, observed on or about 1/2/13.  (b) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, SW Wing near Front Entrance: An employee was working on the 4th level of the scaffold system without the use of guard rails, approximatley 26 feet above grade, observed on or about 1/5/13.  (c) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, Pod Deck: Employees were working on a scaffold positioned on the edge of the back deck without the use of end-rails. Employees were observed working from the top platform and the side brackets, approximatley 16 to 18 feet above grade, observed on or about 1/31/13.  (d) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, Exterior Wall of the Pool Room: Employees were working on the side bracket of the scaffold system that was not provided with end-rails, approximatley 13 feet above grade, observed on or about 2/22/13.  (e) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, SW Wing: When cross bracing was used in lieu of a top-rail, a mid-rail was not provided.  Employees were observed working on the second and third levels of the scaffold system without a mid-rail in place, approximate heights ranging from 13 to 19 feet 6 inches in height above the ground, observed on or about 1/2/13.  (f) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, SW Wing: When cross bracing was used in lieu of a top-rail, a mid-rail was not provided.  Employees were observed working on the second and third levels of the scaffold system without a mid-rail in place, approximate heights ranging from 13 feet to 19 feet six inches in height above the ground, observed on or about 1/3/13.  (g) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, Exterior Wall of Pool Room: When cross bracing was used in lieu of a top-rail, a mid-rail was not provided.  Employees were observed working on the second and third levels of the scaffold system without a mid-rail in place, approximate heights ranging from 13 feet to 19 feet six inches in height above the ground, observed on or about 2/22/13.    NOTE:  IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (1)
  • — Z (W) $14000

1926.451 H02

Willful Gravity 10 4 instances 6 exposed
Issued
May 17, 2013
Abate by
May 23, 2013
Penalty
Initial $14,000 · Current $14,000
29 CFR 1926.451(h)(2): Where there is a danger of tools, materials, or equipment falling from a scaffold and striking employees below, the following provisions apply:  (a) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, SW Wing:  Toeboards nor any other means to prevent tools or materials from falling to lower levels of the fabricated frame scaffolds had been installed, observed on or about 01/02/13.  (b) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ: Toeboards nor any other means to prevent tools or materials from falling to lower levels of the fabricated frame scaffolds had been installed, observed on or about 01/03/13.  (c) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, POD Deck: Toeboards nor any other means to prevent tools or materials from falling to lower levels of the fabricated frame scaffolds had been installed, observed on or about 01/31/13.  (d) Jobsite located at Brandywine Senior Living, 311 Route 73, Voorhees, NJ, Extrerior Pool Room Wall: Toeboards nor any other means to prevent tools or materials from falling to lower levels of the fabricated frame scaffolds had been installed, observed on or about 02/22/13.   NOTE:  IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (1)
  • — Z (W) $14000

View Jhadson Tenesaca's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338206824.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.