AUSTIN, TX —
OSHA Inspection: S.J. LOUIS CONSTRUCTION OF TEXAS LTD.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of S.J. LOUIS CONSTRUCTION OF TEXAS LTD. in 707 1/2 5TH STREET, AUSTIN, TX 78701 (NAICS 237110). OSHA activity number 338481849.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- S.J. LOUIS CONSTRUCTION OF TEXAS LTD.
- Site address
- 707 1/2 5TH STREET
- City
- AUSTIN
- State
- TX
- ZIP
- 78701
- Mailing
- P.O. BOX 834, MANSFIELD, TX 76063
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- Yes
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 237110
- Employees
- 52
- Ownership type
- A
Citations
7 citations on file for this inspection.
1910.134 E01
- Issued
- Jul 22, 2013
- Abate by
- Jul 31, 2013
- Penalty
- Initial $6,600 · Current $3,000 Reduced
General-duty citation text
29 CFR 1910.134(e)(1): The employer did not provide a medical evaluation to determine the employee's ability to use a respirator, before the employee was fit tested or required to use the respirator in the workplace. On or about 28 January 2013, and at times prior thereto, the employer did not ensure that medical evaluations were provided to employees working within the Waller Creek Tunnel Project who were required to wear tight-fitting respirators including, but not limited to, 3M 6000 Series Half Facepiece Respirators with cartridges, while performing excavation operations. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure employees are given a medical evaluation prior to utilizing a tight-fitting respirator.
Recent events (2)
- — I (O) $3000
- — Z (S) $6600
1910.178 L01 I
- Issued
- Jul 22, 2013
- Abate by
- Jul 31, 2013
- Penalty
- Initial $7,000 · Current $4,000 Reduced
General-duty citation text
29 CFR 1910.178(l)(1)(i): The employer did not ensure that each powered industrial truck operator is competent to operate a powered industrial truck safely, as demonstrated by the successful completion of the training and evaluation specified in this paragraph (l). On or about 24 January 2013, and at times prior thereto, the employer allowed employees working within the Waller Creek Tunnel Project to operate a Caterpillar Telehandler Forklift, model TL642, to lift and move loads within the tunnel without successfully completing a combination of formal instruction, practical training, and evaluation of the operator's performance, exposing the employees to struck by hazards while working on and near the forklift. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure employees receive formal instruction, practical training, and an evaluation in order to certify operators prior to operating a forklift.
Recent events (2)
- — I (O) $4000
- — Z (S) $7000
1926.20 B02
- Issued
- Jul 22, 2013
- Abate by
- Jul 31, 2013
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1926.20(b)(2): The employer did not initiate and maintain a safety program which provides for frequent and regular inspections of jobsites, materials, and equipment to be made by a competent person. On or about 24 January 2013, and at times prior thereto, the employer did not ensure that ring steel was inspected by a competent person prior to being assembled and installed by employees within the Waller Creek Tunnel Project, exposing employees to hazards such as, but not limited to being struck by falling materials and/or equipment. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that all materials and equipment are inspected frequently by a competent person.
Recent events (2)
- — I (S) $7000
- — Z (S) $7000
1926.21 B02
- Issued
- Jul 22, 2013
- Abate by
- Jul 31, 2013
- Penalty
- Initial $7,000 · Current $0 Reduced
General-duty citation text
29 CFR 1926.21(b)(2): The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his/her environment to control or eliminate any hazards or other exposure to illness or injury: On or about 24 January 2013, and at times prior thereto, employees working within the Waller Creek Tunnel Project were not provided instruction on the recognition and avoidance of unsafe conditions while performing excavation and ring steel installation operations, exposing the employees to workplace hazards such as, but not limited to being struck by falling materials and/or equipment. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure employees receive instruction on the recognition and avoidance of unsafe conditions specific to the work being performed.
Recent events (2)
- — I (S) $0
- — Z (S) $7000
1926.602 C01 II
- Issued
- Jul 22, 2013
- Abate by
- Jul 31, 2013
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1926.602(c)(1)(ii): Modifications or additions affecting the safe operation of the equipment were made without the manufacturer's written approval. On or about 24 January 2013, and at times prior thereto, employees were operating and working near a Caterpillar Telehandler Forklift, Model TL642, that was modified to lift loads of ring steel weighing approximately 1500 pounds. Employees flipped the fork tines over the backrest where they were facing the rear of the truck, which was in a manner that was not intended or approved by the manufacturer, exposing the employees to the hazard of being struck by a falling load. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure any modifications of powered industrial trucks which affects the capacity and safe operation of such to receive written approval from the manufacturer prior to use as modified.
Recent events (2)
- — I (S) $7000
- — Z (S) $7000
1904.29 B02
- Issued
- Jul 22, 2013
- Abate by
- Jul 31, 2013
- Penalty
- Initial $1,000 · Current $0 Reduced
General-duty citation text
29 CFR 1904.29(b)(2): The employer did not fill out or correctly fill out an OSHA Form 301 or equivalent for each recordable injury or illness. At the inspection site, for the accident that occurred on 24 January 2013, the OSHA 301 Incident Report was incomplete and not maintained at the detail required by the regulation for the case on the OSHA 300 Log. Section 7 and sections 14 through 17 were not provided enough detail in order to understand the event and cause of the injury. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure enough detail is provided for each section of the OSHA 301 Incident Report.
Recent events (2)
- — I (O) $0
- — Z (O) $1000
1904.40 A
- Issued
- Jul 22, 2013
- Abate by
- Jul 31, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1904.40(a): The employer did not provide an authorized government representative the records within the four business hours. On or about 28 January 2013, the employer failed to provide copies of the injury and illness records to an authorized representative. The records were requested per an email on 28 January 2013 at approximately 1:54 PM (Monday) with a due back date and time of 29 January 2013 at 12:00 PM noon. The records were finally provided on 30 January 2013 at approximately 2:29 PM (Wednesday) by email. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure injury and illness records are provided within 4 business hours or by the designated date and time once the request is made to the company.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at S.J. Louis Construction of Texas LTD.
View S.J. Louis Construction of Texas LTD.'s full OSHA safety record →
More inspections in this industry (NAICS 237110)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338481849.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.