FAIRPORT, NY —
OSHA Inspection: PARKER HANNIFIN
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of PARKER HANNIFIN in 83 ESTATES DRIVE WEST, FAIRPORT, NY 14450 (NAICS 326199). OSHA activity number 338501638.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PARKER HANNIFIN
- Site address
- 83 ESTATES DRIVE WEST
- City
- FAIRPORT
- State
- NY
- ZIP
- 14450
- Mailing
- 16 FLAGSTONE DRIVE, HUDSON, NH 03051
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 326199
- Employees
- 122
- Ownership type
- A
Citations
5 citations on file for this inspection.
1910.23 C01
- Issued
- Feb 14, 2013
- Abate by
- May 1, 2013
- Penalty
- Initial $7,000 · Current $5,000 Reduced
General-duty citation text
29 CFR 1910.23(c)(1): Open-sided floors and/or platforms four feet or more above adjacent floor or ground level were not guarded with standard railings (or equivalent) and toeboards: Note: Toeboards are only required when persons can pass, there is moving equipment or there is equipment with which falling materials could create a hazard. a) On or about 1/31/13 in the Processing area: work platform on injection mold machine #19, at a height of 71.5 inches, used to access the hopper and the robot, did not have any fall protection system exposing employees to fall hazards. b) On or about 1/31/13 in the Processing area; work platform on injection mold machine # 46, at a height of 74.75 inches, used to access the hopper and robot, did not have any fall protection system exposing employees to fall hazards. c) On or about 1/31/13 in the Processing area; work platform on injection mold machine # 41, at a height of 72.75 inches, used to access the hopper and robot, did not have any fall protection system exposing employees to fall hazards. d) On or about 1/31/13 in the Processing area; work platform on injection mold machine # 40, at a height of 73 inches, used to access the hopper and robot, did not have any fall protection system exposing employees to fall hazards. Abatement Documentation Required
Recent events (3)
- — J (S) $5000
- — C (S) $7000
- — Z (S) $7000
1910.23 E01
- Issued
- Feb 14, 2013
- Abate by
- May 1, 2013
- Penalty
- Initial $3,000 · Current $2,000 Reduced
General-duty citation text
29 CFR 1910.23(e)(1): Standard railing(s) did not consist of top rail, intermediate rail and/or posts and/or did not have a vertical height of 42 inches (106.7 cm) nominal from upper surface of top rail to floor, platform runway, or ramp level: a) On or about 1/31/13 throughout the injection mold area; the work platform for injection mold machine #15 was at a height of 82 inches from grade. The guard rail system had a top rail of 35 inches and no mid rail. b) On or about 1/31/13 throughout the injection mold area; the work platform for injection mold machine #42 was at a height of 80.5 inches from grade. The guard rail system had no mid rail. c) On or about 1/31/13 throughout the injection mold area; the work platform for injection mold machine #7 was at a height of 93 inches from grade. The guard rail system had a top rail of 36 inches with a mid rail. d) On or about 1/31/13 throughout the injection mold area; the work platform for injection mold machine #49 was at a height of 80.5 inches from grade. The guard rail system had no mid rail. e) On or about 1/31/13 throughout the injection mold area; the work platform for injection mold machine #48 was at a height of 84 inches from grade. The guard rail system had no mid rail. f) On or about 1/31/13 throughout the injection mold area; the work platform for injection mold machine #52 was at a height of 92 inches from grade. The guard rail system had a top rail of 36 inches and with no mid rail. g) On or about 1/31/13 throughout the injection mold area; the work platform for injection mold machine #50 was at a height of 116 inches from grade. The guard rail system had a top rail of 36.5 inches and with no mid rail. h) On or about 1/31/13 throughout the injection mold area; the work platform for injection mold machine #34 was at a height of 90 inches from grade. The guard rail system had a top rail of 37 inches and with a mid rail. i) On or about 1/31/13 throughout the injection mold area; the work platform for injection mold machine #51 was at a height of 91 inches from grade. The guard rail system had a top rail of 36.5 inches and no mid rail. Abatement Certification Required
Recent events (3)
- — J (S) $2000
- — C (S) $3000
- — Z (S) $3000
1910.147 C04 I
- Issued
- Feb 14, 2013
- Abate by
- Mar 17, 2013
- Penalty
- Initial $5,000 · Current $0 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) On or about 01/31/13 throughout the injection mold area; employees are involved in changing the molds on injection mold machines with tonnage less than 500, such as but not limited to, #7,#13,#15, #25,#41,#42,#48,#49, without the use of the applicable Webster Plastic Lockout Tagout Procedure ( form B-116-1602 ). b) On or about 1/31/13 throughout the injection mold area; employees are involved in service and maintenance activities, such as but not limited to, removing, cleaning and reinstalling slides on injection mold machine #15 during production, removing short shots and plastic stuck on injection mold machine#41 during production, tie-in adjustments on various mold machines, without the use of the applicable Webster Plastic Lockout Tagout Procedure ( form B-116-1602 ). Abatement Certification Required
Recent events (3)
- — J (O) $0
- — C (S) $5000
- — Z (S) $5000
1910.147 C04 II D
- Issued
- Feb 14, 2013
- Abate by
- Mar 17, 2013
- Penalty
- Initial $3,000 · Current $0 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(ii)(D): The energy control procedures did not clearly and specifically outline the requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control: a) On or about 1/31/13 throughout the facility; Webster Plastics Lockout/Tagout Procedures ( Form B-116-1602 ), such as but not limited to Procedure number LOTO-32, 43, 44,36,13, 61, did not include a step which required the authorized employee to test the operation of the machine or equipment to verify proper control of hazardous energy. Abatement Certification Required
Recent events (3)
- — J (O) $0
- — C (S) $3000
- — Z (S) $3000
1910.305 B01 I
- Issued
- Feb 14, 2013
- Abate by
- Mar 17, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.305(b)(1)(i): Conductors entering cutout boxes, cabinets, or fittings were not protected from abrasions: a) On or about 1/26/13 in the Premier area; the conduit on the heated extruder head was not secured exposing live conductors (220 volts AC). Abatement Certification Required
Recent events (3)
- — J (O) $0
- — C (O) $0
- — Z (O) $0
More inspections at Parker Hannifin
View Parker Hannifin's full OSHA safety record →
More inspections in this industry (NAICS 326199)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338501638.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.