OSHA Inspection: GENERAL MASONRY GROUP, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of GENERAL MASONRY GROUP, INC. in 431 N. WOLF ROAD, WHEELING, IL 60090 (NAICS 238140). OSHA activity number 338534241.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch General Masonry Group, INC. — free Get an email when a new federal OSHA severe-injury report for General Masonry Group, INC. is published. One employer, no account, unsubscribe in one click.
Site address
431 N. WOLF ROAD
City
WHEELING
State
IL
ZIP
60090
Mailing
6351 W. HUNTINGTON STREET, CHICAGO, IL 60646
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
6
Ownership type
A

6 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 1 exposed
Issued
Jun 13, 2013
Abate by
Jul 17, 2013
Penalty
Initial $400 · Current $400
29 CFR 1903.19(c)(1):  The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:     General Masonry Group, Inc. failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected:     Citation Number                     Item Number                           Abatement Date    01                                            03a                                          02/26/2013      In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (O) $400

1926.451 B01

Serious Gravity 10 1 instance 1 exposed
Issued
Jan 31, 2013
Abate by
Feb 6, 2013
Penalty
Initial $2,800 · Current $1,400 Reduced
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports:     a) Employees were exposed to the hazard of falling approximately 16 feet while working from a scaffolding platform that was not fully planked.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800

1926.451 G01

Serious Gravity 10 2 instances 2 exposed
Issued
Jan 31, 2013
Abate by
Feb 6, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level:     a) Employees were exposed to the hazard of falling approximately 16 feet where guardrail systems were not provided along open sides and ends of scaffolding being used during masonry work.  	  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 C02 II

Serious Gravity 5 8 instances 6 exposed
Issued
Jan 31, 2013
Abate by
Feb 6, 2013
Penalty
Initial $2,000 · Current $1,000 Reduced
29 CFR 1926.451(c)(2)(ii): Unstable objects were used to support scaffolds or platform units:    a) Scaffolding provided for employee use at an elevation of approximately 16 feet was built upon several pieces of scrap lumber and bricks.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1000
  • — Z (S) $2000

1926.451 F07

Serious Gravity 5 1 instance 5 exposed
Issued
Jan 31, 2013
Abate by
Apr 30, 2013
Penalty
Initial $2,000 · Current $1,000 Reduced
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person:     a) The employer did not ensure that scaffolding provided for employee use at the site was erected under the supervision and direction of a competent person qualified in scaffolding erection.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1000
  • — Z (S) $2000

1926.602 D

Serious Gravity 5 1 instance 6 exposed
Issued
Jan 31, 2013
Abate by
Mar 6, 2013
Penalty
Initial $1,600 · Current $800 Reduced
29 CFR 1926.602(d): Note: The requirements applicable to construction work under paragraph (d) of this section are identical to those set forth at paragraph (l) of 29 CFR 1910.178.    29 CFR 1910.178(l)(1)(i): The employer did not ensure that each powered industrial truck operator was competent to operate a powered industrial truck safely, as demonstrated by the successful completion of the training and evaluation specified in this paragraph (l):    a) The employer was operating a JLG 844C-42 all-terrain forklift without ensuring that he was competent to operate the equipment safely, as demonstrated by successful completion of forklift training and evaluation.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $800
  • — Z (S) $1600