OSHA Inspection: ADVANCED DESIGN & CONSTRUCTION COMPANY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ADVANCED DESIGN & CONSTRUCTION COMPANY in 1100 VERMONT AVE., NW, WASHINGTON, DC 20006 (NAICS 236210). OSHA activity number 338586241.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ADVANCED DESIGN & CONSTRUCTION COMPANY
- Site address
- 1100 VERMONT AVE., NW
- City
- WASHINGTON
- State
- DC
- ZIP
- 20006
- Mailing
- 386 EAST MAPLE AVE., SUITE 101, VIENNA, VA 22180
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236210
- Employees
- 5
- Ownership type
- A
Citations
2 citations on file for this inspection.
1926.403 I02 I
- Issued
- Jun 6, 2013
- Abate by
- Jun 18, 2013
- Penalty
- Initial $3,500 · Current $1,750 Reduced
General-duty citation text
29 CFR 1926.403(i)(2)(i): Live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by cabinets or other forms of enclosures, nor by any of the means listed in subparagraph's (A) through (D) of this paragraph: 11th. Floor Elevator Lobby - A Federal Pacific service distribution paned board had five missing circuit breakers thereby exposing workers to a 120 volt electrical contact hazards, on or about 01/29/2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement. This contractor was the Exposing and Controlling employer pursuant to the Occupational Safety & Health Administration's Multi-Employer Work site Policy.
Recent events (2)
- — I (O) $1750
- — Z (S) $3500
1926.403 I01 II
- Issued
- Jun 6, 2013
- Abate by
- Jun 16, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.403(i)(1)(ii): Working space about electric equipment operating at 600 volts, nominal, or less was used for storage: 11th Floor Elevator Lobby - Large stacks of roof insulation panels were stored immediately in front of and surrounding a Federal Pacific circuit distribution panel thereby was completely blocking instant access to the electrical equipment, on or about 01/29/2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement. This contractor was both the Exposing and Controlling employer under the Occupational Safety & Health Administration's Multi-Employer Work site Policy.
Recent events (2)
- — I (O) $0
- — Z (S) $0
More inspections at Advanced Design & Construction Company
View Advanced Design & Construction Company's full OSHA safety record →
More inspections in this industry (NAICS 236210)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338586241.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.