OSHA Inspection: HENRY SCHEIN INC.
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of HENRY SCHEIN INC. in 41 WEAVER ROAD, DENVER, PA 17517 (NAICS 423450). OSHA activity number 338655038.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- HENRY SCHEIN INC.
- Site address
- 41 WEAVER ROAD
- City
- DENVER
- State
- PA
- ZIP
- 17517
- Mailing
- 41 WEAVER ROAD, DENVER, PA 17517
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 423450
- Employees
- 320
- Ownership type
- A
Citations
8 citations on file for this inspection.
1910.23 C03
- Issued
- May 8, 2013
- Abate by
- Jun 4, 2013
- Penalty
- Initial $5,000 · Current $3,250 Reduced
General-duty citation text
29 CFR 1910.23(c)(3): Regardless of height, open-sided floors, walkways, platforms, or runways above or adjacent to dangerous equipment, pickling or galvanizing tanks, degreasing units, and similar hazards were not guarded with a standard railing and toe board: (a) Cardboard Baler Conveyor - Employees push scrap cardboard through a 5 foot wide x 42 inch high opening in the loading dock guardrail onto a moving conveyor, which carries it up an incline into a horizontal baler. The employees were exposed to the hazards of falling onto the moving conveyor on or about February 6, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $3250
- — Z (S) $5000
1910.145 C03
- Issued
- May 8, 2013
- Abate by
- Jun 4, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.145(c)(3): Safety instruction sign(s) were not used where there was a need for general instructions and suggestions relative to safety measure(s): (a) Cardboard Compactor Conveyor - The employer did not provide danger and warning signs to alert employees to of the hazards related to the conveyor at the loading dock area where employees dump cardboard for baling. Employees were exposed possible injury from the moving conveyor on or about February 6, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C04 II B
- Issued
- May 8, 2013
- Abate by
- Aug 4, 2013
- Penalty
- Initial $3,000 · Current $1,950 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: (a) Throughout The Facility - Employees conducted routine servicing and repairs to conveyor systems. The employer did not provide energy control procedures that specifically outlined the steps for isolating the conveyor systems. Although the company had written procedures in appendix G of the Lockout Tagout program, the procedures did not include both the specific type(s) and location(s) of energy isolating devices for each piece of equipment, on or about February 6, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1950
- — Z (S) $3000
1910.147 C06 I
- Issued
- May 8, 2013
- Abate by
- Aug 4, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: (a) Throughout The Facility - Employees conducted routine servicing and repairs to conveyor systems. The employer did not provide conduct periodic inspections, at least annually, of the energy control procedures to ensure that the procedure and the requirement of this standard were being followed, on or about February 6, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.303 B02
- Issued
- May 8, 2013
- Abate by
- Jun 4, 2013
- Penalty
- Initial $3,000 · Current $1,950 Reduced
General-duty citation text
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: a) Shipping Department, North Work Station - The employer permitted relocate-able power taps (surge suppressors) to be connected to each other and used to provide power to computers, computer monitors, printers. Employees were exposed to electrical shock hazards on or about February 6, 2013. b) Shipping Department , Middle Work Station - The employer permitted relocate-able power taps (surge suppressors) to be connected to each other and used to provide power to computers, computer monitors, printers, a scale and a terminal for controlling the conveyor system. Employees were exposed to electrical shock hazards on or about February 6, 2013. c) Shipping Department , South Work Station - The employer permitted relocate-able power taps (surge suppressors) to be connected to each other and used to provide power to computers, computer monitors, printers, mail franking machines, and a scale. Employees were exposed to electrical shock hazards on or about February 6, 2013. d) Shipping Department - The employer permitted standard grounding connectors to be used at the end of flexible cords that were used as pendent branch circuits. Employees were exposed to electrical shock on or about February 6, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1950
- — Z (S) $3000
1910.305 A02 V C
- Issued
- May 8, 2013
- Abate by
- Jun 4, 2013
- Penalty
- Initial $3,000 · Current $1,950 Reduced
General-duty citation text
29 CFR 1910.305(a)(2)(v)(C): Branch-circuit conductors were laid on the floor: a) Shipping Department - The employer allowed a branch circuit consisting of a relocatable power tap and flexible cord to be run on the floor from the middle work station, under a rubber mat, below the conveyor to power the computer terminal used for controlling the conveyor system. Employees walked over and stepped on the branch circuit during the work shift and were exposed to the hazard of electrical shock, on or about 6 February 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1950
- — Z (S) $3000
1910.305 G02 III
- Issued
- May 8, 2013
- Abate by
- May 8, 2013
- Penalty
- Initial $3,000 · Current $1,950 Reduced
General-duty citation text
29 CFR 1910.305(g)(2)(iii): Flexible cords and cables were not connected to devices and fittings so that strain relief was provided that would prevent pull from being directly transmitted to joints or terminal screws: (a) Shipping Department - The employer permitted a relocate-able power tap with no strain relief to be used to provide power to the Pitney Bowes scale on the conveyor system, thereby exposing employees to electrical shock hazards, on or about February 6, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1950
- — Z (S) $3000
1910.253 B04 III
- Issued
- May 8, 2013
- Abate by
- Jun 4, 2013
- Penalty
- Initial $0 · Current $0
X100
General-duty citation text
29 CFR 1910.253(b)(4)(iii): Oxygen cylinders in storage were not separated from fuel-gas cylinders or combustible materials (especially oil or grease), a minimum distance of 20 feet (6.1 m) or by a noncombustible barrier at least 5 feet (1.5 m) high having a fire-resistance rating of at least one-half hour: (a) West Side, Back Of Distribution Center Near The Old Rail Spur - The employer did not ensure that the oxygen cylinder in storage was separated from fuel gas a minimum of 20 feet or by a barrier at least 5 feet high having a fire resistance rating of at least one-half hour. The oxygen/acetylene torch set was last used the previous week when an employee used to to cut apart a tow motor. The oxygen cylinder was observed on or about February 6, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Henry Schein INC.
View Henry Schein INC.'s full OSHA safety record →
More inspections in this industry (NAICS 423450)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338655038.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.