Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: PUTNAM GROUP, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PUTNAM GROUP, LLC in 902 OAK STREET, EATONTON, GA 31024 (NAICS 484110). OSHA activity number 338735244.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Putnam Group, LLC — free Get an email when a new federal OSHA severe-injury report for Putnam Group, LLC is published. One employer, no account, unsubscribe in one click.
Establishment
PUTNAM GROUP, LLC
Site address
902 OAK STREET
City
EATONTON
State
GA
ZIP
31024
Mailing
PO BOX 4728, EATONTON, GA 31024
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
484110
Employees
11
Ownership type
A

6 citations on file for this inspection.

1910.22 A01

Serious Gravity 5 1 instance 3 exposed
Issued
Mar 12, 2013
Abate by
Mar 29, 2013
Penalty
Initial $2,400 · Current $1,440 Reduced
29 CFR 1910.22(a)(1): All places of employment, passageways, storerooms or service rooms were not kept clean and orderly or in a sanitary condition.    On or about February 7, 2013 in the maintenance shop area at 902 Oak Street Eatonton, GA 31024;     The work area for the employees engaged in maintenance, service, and repairs was not kept clean and clear of parts, metal, fluids, and other material exposing the employees to a trip, slip, and fall hazard.
Recent events (2)
  • — I (S) $1440
  • — Z (S) $2400

1910.147 C01

Serious Gravity 10 1 instance 2 exposed
Issued
Mar 12, 2013
Abate by
Apr 19, 2013
Penalty
Initial $2,800 · Current $1,680 Reduced
29 CFR 1910.147(c)(1): The employer did not establish a program consisting of an energy control procedure, employee training and periodic inspections to ensure that before any employee performed any servicing or maintenance on a machine or equipment where the unexpected energing, startup or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source and rendered inoperative:    On or about February 7, 2013 in the maintenance shop area at 902 Oak Street Eatonton, GA 31024;     An energy control program and procedures was not developed where employees were required to work under the trucks and trailers performing maintenance, services, and repairs without locking-out or tagging out the equipment to prevent a crush-by hazard.
Recent events (2)
  • — I (S) $1680
  • — Z (S) $2800

1910.179 J03

Serious Gravity 10 1 instance 2 exposed
Issued
Mar 12, 2013
Abate by
Mar 29, 2013
Penalty
Initial $2,800 · Current $1,680 Reduced
29 CFR 1910.179(j)(3): Complete inspections of the crane was not being performed at intervals as generally defined in paragraph (j)(1)(ii)(b) and the requirements of paragraph (j)(2) of this section and the items in (j)(3):    On or about February 7, 2013 in the maintenance shop area at 902 Oak Street Eatonton, GA 31024;     Employees were observed operating an overhead crane to lift a tractor truck, had deficiencies such as but not limited to damaged electrical wiring, missing hook safety latches, and no inspection documentation on the crane.
Recent events (2)
  • — I (S) $1680
  • — Z (S) $2800

1910.179 L01

Serious Gravity 10 1 instance 2 exposed
Issued
Mar 12, 2013
Abate by
Mar 29, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.179(l)(1): A preventive maintenance program based on the crane manufacturer's recommendations was not established:    On or about February 7, 2013 in the maintenance shop area at 902 Oak Street Eatonton, GA 31024;     No preventive maintenance program was developed for the employees that were observed operating an overhead crane to lift a tractor truck. Deficiencies such as but not limited to damaged electrical wiring, missing hook safety latches, and no inspection documentation on the crane were observed.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.254 D09 III

Serious Gravity 5 1 instance 2 exposed
Issued
Mar 12, 2013
Abate by
Mar 29, 2013
Penalty
Initial $2,000 · Current $1,200 Reduced
29 CFR 1910.254(d)(9)(iii): Cables with damaged insulation or exposed bare conductors were not replace:    On or about February 7, 2013 in the maintenance shop area at 902 Oak Street Eatonton, GA 31024;     The welder used by the employees to repair equipment and to fabricate material had damage ground cable with exposed wiring and insulation missing from the electrical wiring.
Recent events (2)
  • — I (S) $1200
  • — Z (S) $2000

1910.1200 E01

Serious Gravity 5 1 instance 2 exposed
Issued
Mar 12, 2013
Abate by
Mar 29, 2013
Penalty
Initial $2,000 · Current $1,200 Reduced
29 CFR 1910.1200(e)(1):     The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met:    On or about February 7, 2013 in the maintenance shop area at 902 Oak Street Eatonton, GA 31024;     A written hazard communication plan was not developed where employees are required to work with chemicals such as but not limited to: oxygen, acetylene, transmission fluid, oil, brake cleaner, and propane as a part of their daily duties.
Recent events (2)
  • — I (S) $1200
  • — Z (S) $2000

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338735244.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.