OSHA Inspection: REAL STUCCO

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of REAL STUCCO in 3801 VALENTINE STREET, FORT WORTH, TX 76107 (NAICS 238140). OSHA activity number 338842248.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Real Stucco — free Get an email when a new federal OSHA severe-injury report for Real Stucco is published. One employer, no account, unsubscribe in one click.
Establishment
REAL STUCCO
Site address
3801 VALENTINE STREET
City
FORT WORTH
State
TX
ZIP
76107
Mailing
3113 GLEN VISTA DRIVE, KELLER, TX 76248
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
3
Ownership type
A

7 citations on file for this inspection.

1926.451 B01

Serious Gravity 10 2 instances 1 exposed
Issued
May 6, 2013
Abate by
May 14, 2013
Penalty
Initial $2,800 · Current $1,120 Reduced
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units, and the space between the platform and the uprights was no more than one inch wide except where the employer could demonstrate that a wider space was necessary.    A. On or about February 13, 2013, employees applying an EIFS product (exterior insulation and finishing system) to the exterior of a structure were exposed to a fall hazard.  Solid wooden planks did not completely fill in the upright space of the scaffold.  The fall distance to the ground was approximately 13.5 feet.    B. On or about February 13, 2013, employees applying an EIFS product (exterior finishing insulation system) to the exterior of a structure were exposed to a fall hazard.  A piece of plywood that spanned the gap between planks where the scaffold changed direction.  It was not as wide as the existing planked surface.  The fall distance to the ground was approximately 13.5 feet.
Recent events (2)
  • — I (S) $1120
  • — Z (S) $2800

1926.452 C02

Serious Gravity 5 1 instance 1 exposed
Issued
May 6, 2013
Abate by
May 10, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.452(c)(2): Tubular welded frame scaffold(s) were not properly braced by cross or diagonal braces, or both, to secure vertical members laterally and to align them so that the erected scaffold was plumb, square, and rigid:  On or about February 13, 2013, a mid-section of the scaffold, where wall mounted utility panels were located, lacked cross bracing on one or more levels to secure the vertical members together laterally.  Employees were exposed to a hazard of the scaffold collapsing.  The fall distance was approximately 13.5 feet from the working level to the concrete and soil surfaces below.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 F03

Serious Gravity 10 1 instance 1 exposed
Issued
May 6, 2013
Abate by
May 14, 2013
Penalty
Initial $2,800 · Current $1,120 Reduced
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity.    Scaffolding had not been inspected by a competent person, who was trained to recognize deficiencies to ensure that it was set up properly, after it was moved to another portion of the building on February 13, 2013.  Employees were exposed to fall hazards as a result of deficiencies such as not being fully planked, guardrail deficiencies, and incomplete cross bracing.
Recent events (2)
  • — I (S) $1120
  • — Z (S) $2800

1926.454 A

Serious Gravity 10 1 instance 1 exposed
Issued
May 6, 2013
Abate by
May 10, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.454(a): The employer did not have each employee who performed work on a scaffold be trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used, and to understand the procedures to control or minimize those hazards.  On or about February 13, 2013, employees who were working from scaffolds to apply EIFS (exterior insulation and finishing system) had not been trained on the hazards of working from scaffolds.  Fall hazards from scaffold deficiencies such as not being fully planked, guardrail deficiencies, and incomplete cross bracing existed at the time employees were working.  The fall distance from the working level was about 13.5 feet.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.454 B

Serious Gravity 10 1 instance 1 exposed
Issued
May 6, 2013
Abate by
May 10, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.454(b): The employer did not have each employee who was involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question.  On or about February 13, 2013, employees who were working from scaffolds to apply EIFS (exterior insulation and finishing system) also assembled, and disassembled the scaffolds.  Employees had not been trained on the techniques associated with scaffold work.  Fall hazards from scaffold deficiencies such as not being fully planked, guardrail deficiencies, and incomplete cross bracing existed at the time employees were working.  The fall distance from the working level was about 13.5 feet.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G01 VII

Serious Gravity 10 2 instances 1 exposed
Issued
May 6, 2013
Abate by
May 14, 2013
Penalty
Initial $2,800 · Current $1,120 Reduced
29 CFR 1926.451(g)(1)(vii):   Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.      A.  On or about February 13, 2013, employees were exposed to a fall hazard while they performed EIFS (exterior insulation and finishing system) work from a scaffold without being restrained from a fall by a guardrail system or by a personal fall arrest system.  The area of unguarded platform was located on the west end of the scaffold where it extended beyond the corner of the building on the southwest side.  Employees were exposed to a fall hazard at a distance approximately 13.5 feet to the concrete and soil surfaces below.    B.  On or about February 13, 2013, employees were exposed to a fall hazard while they performed EIFS (exterior insulation and finishing system) work from a scaffold without being restrained from a fall by a guardrail system or by a personal fall arrest system.  The area of unguarded platform was located towards the east end of the scaffold near the southeast corner of the building where a section of top railing was missing.  Employees were exposed to a fall hazard at a distance approximately 13.5 feet to the concrete and soil surfaces below.
Recent events (2)
  • — I (S) $1120
  • — Z (S) $2800

1926.451 G04 VII

Serious Gravity 10 1 instance 1 exposed
Issued
May 6, 2013
Abate by
May 10, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(4)(vii): Each top rail or equivalent member of a guardrail system was not capable of withstanding, without failure, a force applied in any downward or horizontal direction at any point along its top edge of at least 200 pounds for guardrail systems installed on scaffolds other than single-point or two-point adjustable suspension scaffolds.  On or about February 13, 2013, employees were exposed to a fall hazard while they performed EIFS (exterior insulation and finishing system) work from a scaffold.  Wood sawn boards were used in some areas of the scaffold that was built along the backside (south side) of the building.  The boards, some of which were cracked, were loosely tied to the scaffold uprights with wire so as not to be secure during a fall event with a distance approximately 13.5 feet to the concrete and soil surfaces below.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Real Stucco's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338842248.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.