EVANSTON, IL ·
OSHA Inspection: SEBASTIAN KOZIURA
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of SEBASTIAN KOZIURA in 919 ASBURY AVE., EVANSTON, IL 60202 (NAICS 236118). OSHA activity number 338913148.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- SEBASTIAN KOZIURA
- Site address
- 919 ASBURY AVE.
- City
- EVANSTON
- State
- IL
- ZIP
- 60202
- Mailing
- 2714 REESE AVE, EVANSTON, IL 60201
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236118
- Employees
- 7
- Ownership type
- A
Citations
14 citations on file for this inspection.
1903.19 C01
- Issued
- Jul 31, 2013
- Abate by
- Sep 3, 2013
- Penalty
- Initial $400 · Current $0 Reduced
General-duty citation text
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: Sebastian Koziura dba Koziura Construction LLC., failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected: Citation Number Item Number Abatement Date 01 01 04/25/2013 02 03/29/2013 01 03 03/29/2013 01 04a 03/29/2013 01 04b 03/29/2013 01 04c 03/29/2013 01 04d 03/29/2013 01 04e 03/29/2013 01 05 04/25/2013 01 06a 04/25/2013 01 06b 03/29/2013 01 06c 03/29/2013 02 01 03/29/2013 In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
- · F (O) $0
- · C (O) $400
- · Z (O) $400
1926.20 B01
- Issued
- Mar 25, 2013
- Abate by
- Apr 25, 2013
- Penalty
- Initial $2,000 · Current $900 Reduced
General-duty citation text
29 CFR 1926.20(b)(1): Program(s) were not initiated and/or maintained to comply with applicable safety and health provisions: a) The employer did not maintain programs to provide for compliance with the OSH Act and control or minimize the safety and health hazards associated with construction work that his employees are required to perform. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
- · F (S) $900
- · C (S) $2000
- · Z (S) $2000
1926.100 A
- Issued
- Mar 25, 2013
- Abate by
- Mar 29, 2013
- Penalty
- Initial $2,000 · Current $900 Reduced
General-duty citation text
29 CFR 1926.100(a): Employees were not protected by protective helmets while working in areas where there was a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns: a) Employees were not wearing protective helmets where there was a possible danger of head injury from falling objects. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
- · F (S) $900
- · C (S) $2000
- · Z (S) $2000
1926.416 A01
- Issued
- Mar 25, 2013
- Abate by
- Mar 29, 2013
- Penalty
- Initial $2,800 · Current $1,200 Reduced
General-duty citation text
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: a) Employees were not protected against accidental contact with energized overhead power lines during framing and carpentry work along north elevation of the new addition to the house. The overhead power lines consisted of secondary lines having a voltage rating of 120/240 volts. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- · F (S) $1200
- · C (S) $2800
- · Z (S) $2800
1926.502 D01
- Issued
- Mar 25, 2013
- Abate by
- Mar 29, 2013
- Penalty
- Initial $2,800 · Current $1,200 Reduced
General-duty citation text
29 CFR 1926.502(d)(1): Personal fall arrest system connectors were not drop forged, pressed or formed steel, or made of equivalent materials: a) An employee was exposed to a fall hazard of approximately 18.3 feet, while using a personal fall arrest system where the lifeline was connected to the anchor point by a hand tied knot. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- · F (S) $1200
- · C (S) $2800
- · Z (S) $2800
1926.502 D06 II
- Issued
- Mar 25, 2013
- Abate by
- Mar 29, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.502(d)(6)(ii): Snaphooks engaged to each other were not of the locking type and not designed for the connection: a) An employee was observed using two lanyards connected together by the snaphooks while working at an elevation of approximately 18.3 feet. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- · F (S) $0
- · C (S) $0
- · Z (S) $0
1926.502 D15
- Issued
- Mar 25, 2013
- Abate by
- Mar 29, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.502(d)(15): Anchorage used for attachment for personal fall arrest equipment was not capable of supporting at least 5,000 pounds (22.2 kN) per employee attached: a) Two employees were attched to the same anchor point that is only rated for one employee. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- · F (S) $0
- · C (S) $0
- · Z (S) $0
1926.502 D17
- Issued
- Mar 25, 2013
- Abate by
- Mar 29, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.502(d)(17): The attachment point of the body harness was not located in the center of the wearer's back near shoulder level, or above the wearer's head: a) The employees were exposed to fall hazards when the attachment point on the harness was not located int he center of the wearers' back. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- · F (S) $0
- · C (S) $0
- · Z (S) $0
1926.502 D18
- Issued
- Mar 25, 2013
- Abate by
- Mar 29, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.502(d)(18) Body belts, harnesses, and components shwere not used only for employee protection (as part of a personal fall arrest system or positioning device system) and were used to hoist materials: a) An employee was using his vertical lifeline to hoist materials. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- · F (S) $0
- · C (S) $0
- · Z (S) $0
1926.503 A01
- Issued
- Mar 25, 2013
- Abate by
- Apr 25, 2013
- Penalty
- Initial $2,000 · Current $900 Reduced
General-duty citation text
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee who might be exposed to fall hazards: a) Employer did not provide training to each employee in order to recognize hazards associated with working at an elevation and to understand procedures to control or minimize those hazards. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (3)
- · F (S) $900
- · C (S) $2000
- · Z (S) $2000
1926.1060 A
- Issued
- Mar 25, 2013
- Abate by
- Apr 25, 2013
- Penalty
- Initial $2,800 · Current $1,200 Reduced
General-duty citation text
29 CFR 1926.1060(a): The employer did not provide a training program for each employee using ladders and stairways, as necessary, which would enable each employee to recognize hazards related to ladders and stairways and train each employee in the procedures to be followed to minimize these hazards: a) Employer did not provide training program to each employee in order to recognize hazards associated with working from ladders, and to understand procedures to control or minimize those hazards. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- · F (S) $1200
- · C (S) $2800
- · Z (S) $2800
1926.1053 B04
- Issued
- Mar 25, 2013
- Abate by
- Mar 29, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1053(b)(4): Ladder(s) were used for purposes other than the purpose for which they were designed: a) An employee was using a 12 foot A-frame step ladder, in the closed/folded position, to apply Tyvek to the structure. The ladder is designed to be used in the open/A-frame position. b) An employee was using the bottom half of an aluminum extension ladder to apply Tyvek to the structure. The ladder is designed to be used with both sections as a single unit. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- · F (S) $0
- · C (S) $0
- · Z (S) $0
1926.1053 B16
- Issued
- Mar 25, 2013
- Abate by
- Mar 29, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1053(b)(16): Portable ladders with structural defects, such as, but not limited to, broken or missing rungs, cleats, or steps, broken or split rails, corroded components, or other faulty or defective components, were not either immediately marked in a manner that readily identifies them as defective, or tagged with "Do Not Use" or similar language, and were not withdrawn from service until repaired: a) Employees were using an aluminum extension ladder was in use that contained structural defects, i.e. cracked and bent rungs and missing feet. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- · F (S) $0
- · C (S) $0
- · Z (S) $0
1926.501 B13
- Issued
- Mar 25, 2013
- Abate by
- Mar 29, 2013
- Penalty
- Initial $5,600 · Current $2,900 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee engaged in residential construction activities 6 feet or more above lower levels was not protected by guardrail systems, safety net systems, or personal fall arrest systems, nor did the employer demonstrate that it is infeasible or creates a greater hazard to use these systems and develop and implement a fall protection plan which meets the requirements of paragraph (k) of section 1926.502: a) Employees engaged in roofing activity were not protected from fall hazards while working at an elevation of approximately 18.3 feet above the ground. Sebastian Koziura dba Koziura Construction LLC. was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29 CFR 1926.501(b)(13) which was contained in OSHA inspection number 313621815, citation 1, item 1, issued on September 14, 2009 and became final order on or about Septmeber 28, 2009 with respect to a workplace located at 823 Ingleside Place, Evanston, IL 60201. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- · F (R) $2900
- · C (R) $5600
- · Z (R) $5600
More inspections at Sebastian Koziura
View Sebastian Koziura's full OSHA safety record →
More inspections in this industry (NAICS 236118)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338913148.