YARMOUTH, ME ·
OSHA Inspection: MARCEL POIRIER CONSTRUCTION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of MARCEL POIRIER CONSTRUCTION in PORTLAND ROAD, YARMOUTH, ME 04096 (NAICS 238160). OSHA activity number 338920747.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MARCEL POIRIER CONSTRUCTION
- Site address
- PORTLAND ROAD
- City
- YARMOUTH
- State
- ME
- ZIP
- 04096
- Mailing
- 61 SOUTH STREET, BIDDEFORD, ME 04005
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 2
- Ownership type
- Private (A)
Citations
2 citations on file for this inspection.
1903.19 C01
- Issued
- Jun 10, 2013
- Abate by
- Jul 26, 2013
- Penalty
- Initial $400 · Current $400
General-duty citation text
29 CFR 1903.19(c)(1): Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section. At the jobsite - The employer did not furnish the abatement required for citations issued within 10 calendar days, nor did they respond to the progress report letters sent 04/29/2013 and 05/14/2013.
Recent events (1)
- · Z (O) $400
1926.453 B02 V
- Issued
- Feb 28, 2013
- Abate by
- Mar 6, 2013
- Penalty
- Initial $1,200 · Current $1,200
General-duty citation text
29 CFR 1926.453(b)(2)(v): A body belt with lanyard attached to the boom or basket was not worn by employee(s) working from an aerial lift: At the Jobsite - The employee working in the aerial lift was not tied off with belt or harness and lanyard.
Recent events (1)
- · Z (S) $1200
More inspections at Marcel Poirier Construction
View Marcel Poirier Construction's full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in ME
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 338920747.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.