Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,197,549Inspections Most recent open 2026-08-27 Last loaded 2026-08-31

OSHA Inspection: ACUNA DEMOLITION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ACUNA DEMOLITION in 200 GULF POINT, SOUTH PADRE ISLAND, TX 78597 (NAICS 238990). OSHA activity number 338931371.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Acuna Demolition for free Get an email when a new federal OSHA severe-injury report for Acuna Demolition is published. One employer, no account, unsubscribe in one click.
Establishment
ACUNA DEMOLITION
Site address
200 GULF POINT
City
SOUTH PADRE ISLAND
State
TX
ZIP
78597
Mailing
108 LIMON STREET, LOS FRESNOS, TX 78566
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238990
Employees
8
Ownership type
Private (A)

2 citations on file for this inspection.

1926.701 B

Serious Gravity 5 1 instance 2 exposed
Issued
Apr 15, 2013
Penalty
Initial $1,600 · Current $1,600
29 CFR 1926.701(b):     All protruding reinforcing steel, onto and/or into which employees could fall or come against, was not guarded to eliminate the hazard of impalement:    Inside an excavation job site, rebar stakes approximately 6 inches tall were left unprotected against impalements.
Recent events (1)
  • · Z (S) $1600

1926.652 C

Serious Gravity 10 1 instance 2 exposed
Issued
Apr 15, 2013
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.652(c):     Designs of support systems, shield systems, and other protective systems were not selected and constructed by the employer or his designee and were not be in accordance with the requirements of paragraph (c)(1); or, in the alternative, paragraph (c)(2); or, in the alternative, paragraph (c)(3); or, i the alternative, paragraph (c)(4) as follows:    At this excavation site, employees worked within a plywood box designed to protect the employees against the hazards of a cave-in. The box was not designed and constructed in accordance with a registered, professional engineer's certification that it would adequately protect employees in the event of a cave-in.
Recent events (1)
  • · Z (S) $2800

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 338931371.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.