OSHA Inspection: D.C. STUCCO

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of D.C. STUCCO in 701 BRANDON WAY, AUSTIN, TX 78733 (NAICS 238170). OSHA activity number 338952757.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch D.C. Stucco for free Get an email when a new federal OSHA severe-injury report for D.C. Stucco is published. One employer, no account, unsubscribe in one click.
Establishment
D.C. STUCCO
Site address
701 BRANDON WAY
City
AUSTIN
State
TX
ZIP
78733
Mailing
11344 RIM ROCK TRL, AUSTIN, TX 78737
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238170
Employees
5
Ownership type
Private (A)

8 citations on file for this inspection.

1926.405 A02 II I

Serious Gravity 1 11 instances 1 exposed
Issued
Apr 19, 2013
Abate by
May 3, 2013
Penalty
Initial $1,200 · Current $720 Reduced
29 CFR 1926.405(a)(2)(ii)(I): Flexible cords and cables used for temporary wiring were not protected from damage.  On or about March 12, 2013, an employee was using a portable power drill to attach walk boards on the roof exposed to an electrical hazard in that the drill was connected to a damaged extension cord.
Recent events (2)
  • · I (S) $720
  • · Z (S) $1200

1926.451 B01

Serious Gravity 5 1 instance 4 exposed
Issued
Apr 19, 2013
Abate by
May 3, 2013
Penalty
Initial $1,600 · Current $960 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports:  On or about March 12, 2013, employees were applying stucco to the residential home under construction working from a three tier tubular welded scaffold that was not fully planked, exposing the employees to a fall hazard.
Recent events (2)
  • · I (S) $960
  • · Z (S) $1600

1926.451 E01

Serious Gravity 5 1 instance 4 exposed
Issued
Apr 19, 2013
Abate by
May 3, 2013
Penalty
Initial $2,400 · Current $1,440 Reduced
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, sturcure, personnel hoist, or similar surface was not used.  Crossbraces were used as a means of access.  On or about March 12, 2013, employees were applying stucco to the residential home under construction working from a three tier tubular welded scaffold that did not have a ladder for access, exposing the employees to a fall hazard.
Recent events (2)
  • · I (S) $1440
  • · Z (S) $2400

1926.451 F07

Serious Gravity 5 1 instance 5 exposed
Issued
Apr 19, 2013
Abate by
Jun 3, 2013
Penalty
Initial $2,400 · Current $1,440 Reduced
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person.  On or about March 12, 2013, the foreman and employees erected a scaffold to apply stucco to the residential home under construction. The scaffold was not erected by trained employees and was not supervised by a person competent in scaffold erection.
Recent events (2)
  • · I (S) $1440
  • · Z (S) $2400

1926.454 A

Serious Gravity 5 1 instance 5 exposed
Issued
Apr 19, 2013
Abate by
May 3, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.454(a): The employer did not have each employee who performed work on a scaffold be trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used, and to understand the procedures to control or minimize those hazards.  On or about March 12, 2013, the foreman and employees were working from the tubular welded scaffolding to apply stucco to the residential home under construction without being trained to recognize the hazards of working from scaffolding, exposing employees to a fall hazard.    The training shall include the following areas, as applicable:    a)  Any electrical hazards, fall hazards and falling object hazards in the work area; b)  The correct procedures for dealing with electrical hazards and for erecting, maintaining, and disassembling the fall protection systems and falling object protection systems being used; c)  The proper use of the scaffold, and the proper handling of materials on the scaffold; d)  The maximum intended load and load-carrying capacities of the scaffolds used; and  e)  Any other pertinent requirements of this subpart.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.454 B

Serious Gravity 5 1 instance 5 exposed
Issued
Apr 19, 2013
Abate by
May 3, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.454(b): The employer did not have each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question.  On or about March 12, 2013, the foreman and employees erected scaffolding to apply stucco to the residential home under construction. The erection of the scaffold was not supervised by a competent person and the workers were not trained in scaffold erection, exposing employees to a fall hazard.   The training shall include the following topics, as applicable:    a)  The nature of scaffold hazards; b)  The correct procedures for erecting, disassembling, moving, operating, repairing, inspecting, and maintaining the type of scaffold in question;  c)  The design criteria, maximum intended load-carrying capacity and intended use of the scaffold; d)  Any other pertinent requirements of this subpart.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.451 G04 I

Serious Gravity 5 1 instance 5 exposed
Issued
Apr 19, 2013
Abate by
May 3, 2013
Penalty
Initial $2,400 · Current $1,440 Reduced
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms.   On or about March 12, 2013, employees were applying stucco to the residential home under construction up to approximately 18 feet high from a tubular welded scaffold that did not include guard rails, exposing employees to a fall hazard.
Recent events (2)
  • · I (S) $1440
  • · Z (S) $2400

1926.501 B13

Serious Gravity 5 1 instance 5 exposed
Issued
Apr 19, 2013
Abate by
May 3, 2013
Penalty
Initial $2,400 · Current $1,440 Reduced
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):   On or about March 11, 2013, an employee was removing walking boards from the roof of the residential home under construction up to approximately 12 feet high without fall protection, exposing the employees to a fall hazard.
Recent events (2)
  • · I (S) $1440
  • · Z (S) $2400

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 338952757.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.