OSHA Inspection: LANCASTER MOLD, INC.

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of LANCASTER MOLD, INC. in 2501 HORSESHOE ROAD, LANCASTER, PA 17601 (NAICS 333511). OSHA activity number 338956915.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Lancaster Mold, INC. for free Get an email when a new federal OSHA severe-injury report for Lancaster Mold, INC. is published. One employer, no account, unsubscribe in one click.
Site address
2501 HORSESHOE ROAD
City
LANCASTER
State
PA
ZIP
17601
Mailing
2501 HORSESHOE ROAD, LANCASTER, PA 17601
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
333511
Employees
45
Ownership type
Private (A)

2 citations on file for this inspection.

1910.132 D02

Serious Gravity 1 1 instance 45 exposed
Issued
Apr 30, 2013
Abate by
Jun 2, 2013
Penalty
Initial $1,785 · Current $1,339 Reduced
29 CFR 1910.132(d)(2): The employer did not verify that the required workplace hazard assessment has been performed through a written certification that identifies the workplace evaluated; the person certifying that the evaluation has been performed; the date(s) of the hazard assessment; and, which identifies the document as a certification of hazard assessment:  (a) Lancaster Mold, Incorporated - The employer did not develop a formal hazard assessment, on or about April 10, 2013.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $1338.75
  • · Z (S) $1785

1910.147 C04 I

Serious Gravity 5 1 instance 40 exposed
Issued
Apr 30, 2013
Abate by
Jun 2, 2013
Penalty
Initial $2,380 · Current $1,785 Reduced
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section:  (a) Lancaster Mold, Incorporated - The employer's Lockout/Tagout Program did not include machines specific procedures that clearly explained the process to be followed for each type of machine, i.e. plastic injection machines, on or about April 10, 2013.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $1785
  • · Z (S) $2380

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 338956915.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.