ATGLEN, PA ·
OSHA Inspection: ACTION MANUFACTURING COMPANY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ACTION MANUFACTURING COMPANY in 500 BAILEY CROSSROADS, ATGLEN, PA 19310 (NAICS 325920). OSHA activity number 338970718.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ACTION MANUFACTURING COMPANY
- Site address
- 500 BAILEY CROSSROADS
- City
- ATGLEN
- State
- PA
- ZIP
- 19310
- Mailing
- 500 BAILEY CROSSROADS, ATGLEN, PA 19310
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 325920
- Employees
- 56
- Ownership type
- Private (A)
Citations
6 citations on file for this inspection.
1910.119 E01
- Issued
- Sep 12, 2013
- Abate by
- Oct 16, 2013
- Penalty
- Initial $4,500 · Current $3,375 Reduced
General-duty citation text
29 CFR 1910.119(e)(1): The process hazard analysis was not appropriate to the complexity of the process: (a) Action Manufacturing Company, Atglen, Pa- The employer performed processes to manufacture four different types of explosive products at the facility as well as associated processes for handling explosive powders, explosive pellets and blending and mixing explosive ingredients. In December 1998 a Process Hazard Analysis (PHA) (hazard evaluation) was performed identifying the hazards within the plant and the associated areas in which they were performed. There were no PHAs performed for the specific processes covered by this standard that were identified by this effort in a March 2000 report by Safety Management Services (SMS 98-0069). Conditions observed on or about May 2, 2013. NOTE: Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (3)
- · F (S) $3375
- · C (S) $4500
- · Z (S) $4500
1910.119 E06
- Issued
- Sep 12, 2013
- Abate by
- Oct 16, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(e)(6): The process hazard analysis was not updated and revalidated every five years: a) Action Manufacturing Company, Atglen, PA- The employer performed an initial Process Hazard Analysis in December 1998 and possessed a March, 2000 report prepared by Safety Management Systems (SMS 98-0069). There are no updates or revalidations to the PHA which was intended to address all of the explosive manufacturing processes in the facility. Conditions observed on or about May 2, 2013. NOTE: Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (3)
- · F (S) $0
- · C (S) $0
- · Z (S) $0
1910.119 E05
- Issued
- Sep 12, 2013
- Abate by
- Oct 16, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(e)(5): The employer did not establish a system to promptly address the PHA team's findings and recommendations, to assure the recommendations were resolved in a timely manner, and to assure the resolutions were documented: a) Action Manufacturing Company, Atglen, PA- The employer performed an initial Process Hazard Analysis in December 1998 and possessed a March, 2000 report prepared by Safety Management Systems (SMS 98-0069). Table 1 Hazard Analysis Recommendations for Action Manufacturing enumerates 37 Operations/Items each having multiple recommendations. Safety Action Requests dated 22 February 2011 list the majority of the recommendations as "O" for open. Those recommendations listed as "I" for implemented are not supported with the documented resolution. Conditions observed on or about May 2, 2013. NOTE: Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (3)
- · F (S) $0
- · C (S) $0
- · Z (S) $0
1910.119 C01
- Issued
- Sep 12, 2013
- Abate by
- Oct 1, 2013
- Penalty
- Initial $4,500 · Current $3,375 Reduced
General-duty citation text
29 CFR 1910.119(c)(1): The employer did not develop a written plan of action regarding the implementation of the employee participation required by this paragraph: a) Action Manufacturing Company, Atglen, PA- The employer did not develop a written plan of action to consult with employees on the conduct and development of information required by the Process Safety Management Standard. Observed on or about May 2, 2013.
Recent events (3)
- · F (S) $3375
- · C (S) $4500
- · Z (S) $4500
1910.119 L01
- Issued
- Sep 12, 2013
- Abate by
- Oct 16, 2013
- Penalty
- Initial $4,500 · Current $3,375 Reduced
General-duty citation text
29 CFR 1910.119(l)(1): The employer did not establish written procedures to manage changes to process chemicals, technology, equipment, and procedures, and changes to facilities that affect a covered process: a) Action Manufacturing Company, Atglen, PA- The employer performed an initial Process Hazard Analysis in December 1998 and possessed a March, 2000 report prepared by Safety Management Systems (SMS 98-0069). There were no written procedures to manage change developed to address changes that could effect explosives manufacturing processes in the facility. Observed on or about May 2, 2013. NOTE: Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (3)
- · F (S) $3375
- · C (S) $4500
- · Z (S) $4500
1910.119 O01
- Issued
- Sep 12, 2013
- Abate by
- Oct 16, 2013
- Penalty
- Initial $4,500 · Current $3,375 Reduced
General-duty citation text
29 CFR 1910.119(o)(1): The employer did not evaluate compliance with the provisions of 29 CFR 1910.119 Process Safety Management, at least every three years, to verify that the procedures and practices developed under the standard were adequate and being followed: a) Action Manufacturing Company, Atglen, PA- The employer performed an initial Process Hazard Analysis in December 1998 and possessed a March, 2000 report prepared by Safety Management Systems (SMS 98-0069). There were no compliance audits performed to verify that procedures and practices developed under the standard were developed and being followed. Observed on or about May 2, 2013. NOTE: Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (3)
- · F (S) $3375
- · C (S) $4500
- · Z (S) $4500
More inspections at Action Manufacturing Company
View Action Manufacturing Company's full OSHA safety record →
More inspections in this industry (NAICS 325920)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 338970718.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.