FREDERICKTOWN, MO —
OSHA Inspection: MADISON COUNTY WOOD PRODUCTS INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of MADISON COUNTY WOOD PRODUCTS INC. in 4597 HIGHWAY C, FREDERICKTOWN, MO 63645 (NAICS 321113). OSHA activity number 338972607.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MADISON COUNTY WOOD PRODUCTS INC.
- Site address
- 4597 HIGHWAY C
- City
- FREDERICKTOWN
- State
- MO
- ZIP
- 63645
- Mailing
- 4597 HIGHWAY C, FREDERICKTOWN, MO 63645
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 321113
- Employees
- 100
- Ownership type
- A
Citations
5 citations on file for this inspection.
1910.147 C07 IV
- Issued
- Apr 5, 2013
- Abate by
- May 22, 2013
- Penalty
- Initial $1,785 · Current $1,250 Reduced
General-duty citation text
29 CFR 1910.147(c)(7)(iv): The employer did not certify that employee training had been accomplished and kept up to date: a. Authorized lockout training was not documented for all emplyees. i. For a Kent single head band saw worker. ii. For a West Plains double head band saw worker. iii. For Salem resaw worker. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
- — I (S) $1249.5
- — Z (S) $1785
1910.147 C07 III C
- Issued
- Apr 5, 2013
- Abate by
- May 22, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(7)(iii)(C): Retraining of employees did not reestablish employee proficiency in the new or revised control methods and procedures: a. The employer did not ensure that the scrag mill supervisor required that employees performing lockout work followed the procedures, such as, but not limited to, after locking out equipment authorized employees keeping the key in their possession, and ensuring that employees were authorized to lockout and that locks were placed on the energy control device by the employee performing the work. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C08
- Issued
- Apr 5, 2013
- Abate by
- May 22, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(8): Lockout or tagout was not performed only by the authorized employees who were performing the servicing or maintenance: a. During cleaning of the West Plains double head band saw, an employee performing the work did not apply the lock to the energy control device. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 D04 II
- Issued
- Apr 5, 2013
- Abate by
- May 22, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(d)(4)(ii): Lockout devices utilized were not affixed in a manner that held the energy isolating device in a safe or off position: a. At the Kent single head band saw an employee performing lockout work did not remove the key from the lock and keep in his possession. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 F03 II D
- Issued
- Apr 5, 2013
- Abate by
- May 22, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(f)(3)(ii)(D): Each authorized employee did not affix a personal lockout or tagout device to the group lockout device before working on the machine or equipment: a. At the Salem resaw, an employee had been performing lockout work relying on lock placement by another employee also performing lockout work. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at Madison County Wood Products INC.
View Madison County Wood Products INC.'s full OSHA safety record →
More inspections in this industry (NAICS 321113)
More inspections in MO
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338972607.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.