CAMPBELLTOWN, PA —
OSHA Inspection: SMUCKER BUILDERS LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of SMUCKER BUILDERS LLC in PALMYRA ROAD BUILDING 2, CAMPBELLTOWN, PA 17010 (NAICS 238170). OSHA activity number 338973563.
Where did this inspection happen?
- Establishment
- SMUCKER BUILDERS LLC
- Site address
- PALMYRA ROAD BUILDING 2
- City
- CAMPBELLTOWN
- State
- PA
- ZIP
- 17010
- Mailing
- 612 AMISH SCHOOL ROAD, HERNDON, PA 17830
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238170
- Employees
- 6
- Ownership type
- A
Citations
2 citations on file for this inspection.
1926.451 G04 I
- Issued
- Penalty
- Initial $1600.00 · Current $1200.00 Reduced
General-duty citation text
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms. a) Northside Crossing Apartments, Palymra Road - An employee was exposed to an 11 foot - 10 inch fall from the platform of a pump jack scaffold which had not been provided with midrails or endrails, on or about March 7, 2013. No abatement certification or documentation required.
Recent events (2)
- — I (S) $1200
- — Z (S) $1600
1926.454 A
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. a) Northside Crossing Apartments, Palmyra Road - Employees were not trained to recognize hazards in the safe use of a pump jack scaffold and how to correct hazards such as, but not limited to fall hazards, on or about March 7, 2013. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 238170)
OXFORD, OH—2026-07-13
R&R SIDING LLC
WINSTON SALEM, NC—2026-07-10
161522 - MS SIDING LLC
SLINGER, WI—2026-07-10
DYLAN MATTHEW SHELLEY LLC
WINSTON SALEM, NC—2026-07-09
161514 - ALPHA OMEGA CONSTRUCTION GROUP, INC
ATLANTA, GA—2026-07-09
ESV CONSTRUCTION LLC
More inspections in PA
MILTON, PA—2026-07-10
HOMETOWN FOODS CHEF BOYARDEE CO.
SUNBURY, PA—2026-07-10
DEMPSEY UNIFORM & LINEN SUPPLY, INC
LANDISVILLE, PA—2026-07-10
FAIRVIEW DEMOLITION LLC
YORK, PA—2026-07-10
AMERICAN SPECIALTY SYSTEMS INC.
WILLIAMSPORT, PA—2026-07-10
INTERNATIONAL PAINT PROS
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338973563.