Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: A&L CONSTRUCTION DBA

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of A&L CONSTRUCTION DBA in 173 WASHINGTON AVENUE, NORTH HAVEN, CT 06473 (NAICS 238140). OSHA activity number 338973738.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch A&L Construction DBA — free Get an email when a new federal OSHA severe-injury report for A&L Construction DBA is published. One employer, no account, unsubscribe in one click.
Site address
173 WASHINGTON AVENUE
City
NORTH HAVEN
State
CT
ZIP
06473
Mailing
244 HOWARD AVENUE, NEW HAVEN, CT 06519
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
2
Ownership type
A

10 citations on file for this inspection.

1910.1200 E01

Serious Gravity 1 1 instance 2 exposed
Issued
Jun 24, 2013
Abate by
Jul 19, 2013
Penalty
Initial $1,200 · Current $1,200
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: (Construction Reference: 1926.59):  JOBSITE:  The employer had not developed and implemented a written Hazard Communication program where employes were required to work with and handle chemicals, such as (but not limited to) Decoplast Graffiato Finish White Base and Green Industries Standard Base Coat (which contains Portland Cement).
Recent events (1)
  • — Z (S) $1200

1910.1200 G08

Serious Gravity 1 1 instance 2 exposed
Issued
Jun 24, 2013
Abate by
Jul 19, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(g)(8):   The employer did not maintain in the workplace copies of the required safety data sheets for each hazardous chemical, and did not ensure that they were readily accessible during each work  shift to employees when they were in their work area(s)  JOBSITE:  The employer did not maintain Material Safety Data sheets for chemicals, such as (but not limited to) Decoplast Graffiato Finish White Base and Green Industries Standard Base Coat (which contains Portland cement) which were used by employees.
Recent events (1)
  • — Z (S) $0

1910.1200 H

Serious Gravity 1 1 instance 2 exposed
Issued
Jun 24, 2013
Abate by
Jul 19, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(h): Employees were not provided effective information and training as specified in 29 CFR 1910.1200(h)(1) and (2) on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard was introduced in their place of work:  JOBSITE:  The employer did not provide information and training on Hazard Communication to employees who were required to work with and handle chemicals, such as (but not limited to) Decoplast Graffiato Finish White Base and Green Industries Standard Base Coat (which contains Portland cement).
Recent events (1)
  • — Z (S) $0

1926.451 B01

Serious Gravity 10 1 instance 1 exposed
Issued
Jun 24, 2013
Abate by
Jul 5, 2013
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii)  JOBSITE:  The platform of a fabricated metal frame scaffold, from which an employee was installing insulation, was not fully planked on all levels.
Recent events (1)
  • — Z (S) $2800

1926.451 E01

Serious Gravity 5 1 instance 1 exposed
Issued
Jun 24, 2013
Abate by
Jul 5, 2013
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, sturcure, personnel hoist, or similar surface was not used.  Crossbraces were used as a means of access.  JOBSITE:  The fabricated frame scaffold platform, from which an employee was installing insulation to the exterior of a building was not provided with a safe means of access.
Recent events (1)
  • — Z (S) $2000

1926.451 F07

Serious Gravity 5 1 instance 1 exposed
Issued
Jun 24, 2013
Abate by
Jul 19, 2013
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person.  JOBSITE:  The fabricated frame scaffold from which an employee was engaged in installing exterior insulation, was not erected under the supervision and direction of a competent person.
Recent events (1)
  • — Z (S) $2000

1926.451 G01 VII

Serious Gravity 10 1 instance 1 exposed
Issued
Jun 24, 2013
Abate by
Jul 5, 2013
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.  JOBSITE:  The employee installing insulation and applying stucco paste to the exterior of a building from the platform of a fabricated frame scaffold was not protected from the hazard of falling 13 feet 7 inches to the ground by use of guardrails, personal fall arrest system or other equivalent devices.
Recent events (1)
  • — Z (S) $2800

1926.454 A

Serious Gravity 5 1 instance 1 exposed
Issued
Jun 24, 2013
Abate by
Jul 19, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards.  JOBSITE:  The employee installing insulation and applying stucco paste to the exterior of a building from a fabricated frame scaffold was not provided training and information to recognize and control the hazards associated with the use of scaffolds.
Recent events (1)
  • — Z (S) $0

1926.452 C02

Serious Gravity 5 1 instance 1 exposed
Issued
Jun 24, 2013
Abate by
Jul 5, 2013
Penalty
Initial $1,600 · Current $1,600
29 CFR 1926.452(c)(2): Tubular welded frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would have secured vertical members together laterally:  JOBSITE:  The fabricated metal frame scaffod from that the employee was working was missing cross braces that could cause the scaffold to be unstable and out of plumb.
Recent events (1)
  • — Z (S) $1600

1926.404 B01 I

Other-than-serious 1 instance 1 exposed
Issued
Jun 24, 2013
Abate by
Jul 5, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.404(b)(1)(i): Employer did not use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section, or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites:    JOBSITE:  The employer was neither using Ground Fault Circuit Interrupters (GFCI) nor utilizing an Assured Equipment Grounding Program for employees protection while using electrical tools.
Recent events (1)
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338973738.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.