OSHA Inspection: STUCCO RYSZARD INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of STUCCO RYSZARD INC. in 1902 W. ARMITAGE AVE., CHICAGO, IL 60605 (NAICS 238140). OSHA activity number 338974397.

Watch Stucco Ryszard INC. — free Get an email when a new federal OSHA severe-injury report for Stucco Ryszard INC. is published. One employer, no account, unsubscribe in one click.
Establishment
STUCCO RYSZARD INC.
Site address
1902 W. ARMITAGE AVE.
City
CHICAGO
State
IL
ZIP
60605
Mailing
7650 ALTGELD APT 406, ELMWOOD PARK, IL 60707
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
3
Ownership type
A

7 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $400.00 · Current $400.00
29 CFR 1903.19(c)(1):  The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:     Stucco Ryszard Inc., failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected:     Citation Number                     Item Number                           Abatement Date  01                                            04                                            07/31/2013    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (O) $400

1926.451 B01

Serious Gravity 10 2 instances 1 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1260.00 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):     a) Employees were exposed to the hazard of falling from working levels at elevations of approximately 30 and 45 feet while working from scaffolding platforms that were not fully planked.   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $1260
  • — Z (S) $2800

1926.451 C03

Serious Gravity 5 12 instances 1 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $900.00 Reduced
29 CFR 1926.451(c)(3): Frames and panels were not joined together vertically by coupling or stacking pins or equivalent means:   a) Scaffolding being used at an elevation of up to approximately 45 feet did not have all frames and panels joined together by coupling or stacking pins or equivalent means.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $900
  • — Z (S) $2000

1926.451 E01

Serious Gravity 10 2 instances 1 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1260.00 Reduced
29 CFR 1926.451(e)(1): Safe access was not provided to scaffold platforms when the platforms were more than 2 feet above or below the point of access:      a) Employees were not provided with safe access to scaffolding from which they were required to work at elevations of approximately 30 and 45 feet.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $1260
  • — Z (S) $2800

1926.451 F07

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $900.00 Reduced
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person:       a) The employer did not ensure that scaffolding provided for employee use at the site was erected under the supervision and direction of a competent person qualified in scaffolding erection.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $900
  • — Z (S) $2000

1926.451 G01

Serious Gravity 10 2 instances 1 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1260.00 Reduced
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level:     a) Employees were exposed to the hazard of falling from elevation of approximately 30 and 45 feet while working from scaffolding without the benefit of fall protection.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $1260
  • — Z (S) $2800

1926.501 B01

Serious Gravity 10 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $2800.00 · Current $1260.00 Reduced
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems:  a) Employees were exposed to the hazard of falling approximately 35 feet while walking and working from an edge/ledge of the building adjacent to scaffolding being used during stucco work.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.