WASHINGTON, DC ·
OSHA Inspection: AYT AUTO SERVICE
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of AYT AUTO SERVICE in 620 I STREET, NW, WASHINGTON, DC 20001 (NAICS 811111). OSHA activity number 338976087.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- AYT AUTO SERVICE
- Site address
- 620 I STREET, NW
- City
- WASHINGTON
- State
- DC
- ZIP
- 20001
- Mailing
- 2121 WEST VIRGINIA AVENUE, NE, WASHINGTON, DC 20002
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 811111
- Employees
- 3
- Ownership type
- Private (A)
Citations
8 citations on file for this inspection.
5(a)(1)
- Issued
- Apr 30, 2013
- Abate by
- May 8, 2013
- Penalty
- Initial $3,500 · Current $1,750 Reduced
General-duty citation text
OSH ACT of 1970 Section (5)(a)(1): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to workers, in that employees were exposed to struck by and crushing hazards while working under defective automotive lifts: a) Bay Area Globe Lift - On or about March 26, 2013, an employee was observed standing below a vehicle raised overhead on a surface mounted two post Globe hydraulic vehicle lift and the swing arm lift pads were missing, exposing the employee to a struck by and or crushing hazard. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $1750
- · Z (S) $3500
1910.132 D01
- Issued
- Apr 30, 2013
- Abate by
- May 8, 2013
- Penalty
- Initial $2,800 · Current $1,400 Reduced
General-duty citation text
29 CFR 1910.132(d)(1): The employer did not assess the workplace to determine if hazards are present, or are likely to be present, which necessitate the use of personal protective equipment (PPE): a) Bay Area - On or about March 26, 2013, an employee was observed standing below an automobile oil pan being emptied and not wearing eye protection. No assessment indicating the need for personal protective equipment had been performed. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $1400
- · Z (S) $2800
1910.133 A01
- Issued
- Apr 30, 2013
- Abate by
- May 4, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.133(a)(1): Protective eye equipment was not required where there was a reasonable probability of injury that could be prevented by such equipment: a) Bay Area - On or about March 26, 2013, an employee was observed standing below an automobile oil pan being emptied and not wearing eye protection. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1910.215 A04
- Issued
- Apr 30, 2013
- Abate by
- May 4, 2013
- Penalty
- Initial $3,500 · Current $1,750 Reduced
General-duty citation text
29 CFR 1910.215(a)(4): Work rest(s) on grinding machinery were not adjusted closely to the wheel with a maximum opening of one eighth inch: a) Bay Area - On or about March 26, 2013, an employee was using a Craftsman 6 inch bench grinder to remove burrs from a brake pad and the tool rest was located one inch from the face of the grinding wheel. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $1750
- · Z (S) $3500
1910.215 B09
- Issued
- Apr 30, 2013
- Abate by
- May 4, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.215(b)(9): The distance between the abrasive wheel periphery(s) and the adjustable tongue or the end of the safety guard peripheral member at the top exceeded one fourth inch: a) Bay Area - On or about March 26, 2013, an employee was using a Craftsman 6 inch bench grinder to remove burrs from a brake pad and the tongue guard was located one inch from the face of the grinding wheel. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1910.303 F02
- Issued
- Apr 30, 2013
- Abate by
- Jun 2, 2013
- Penalty
- Initial $3,500 · Current $1,750 Reduced
General-duty citation text
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: a) Bay Area - On or about March 26, 2013, three electrical disconnects mounted on the wall were not identified to allow employees to know its purpose, 100 amp service. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $1750
- · Z (S) $3500
1910.304 G05
- Issued
- Apr 30, 2013
- Abate by
- Jun 2, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: a) Bay Area - On or about March 26, 2013, employees were using a Craftsman bench grinder and the outlet receptacle indicated an open ground, 110 volt, 15 amp service. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1910.106 E02 II
- Issued
- Apr 30, 2013
- Abate by
- May 4, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.106(e)(2)(ii): Flammable or combustible liquids were not stored in tanks or closed containers: a) Bay Area - On or about March 26, 2013, four (55) gallon plastic drums which contained used motor oil were not provided with bung caps. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (O) $0
- · Z (O) $0
More inspections in this industry (NAICS 811111)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 338976087.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.