CHICAGO, IL ·
OSHA Inspection: PIONEER TUCKPOINTING INC.
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of PIONEER TUCKPOINTING INC. in 2536 N SAWYER, CHICAGO, IL 60647 (NAICS 238140). OSHA activity number 338982812.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PIONEER TUCKPOINTING INC.
- Site address
- 2536 N SAWYER
- City
- CHICAGO
- State
- IL
- ZIP
- 60647
- Mailing
- 9108 N LINCOLN, DES PLAINES, IL 60016
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 10
- Ownership type
- A
Citations
3 citations on file for this inspection.
1910.1200 E01
- Issued
- Apr 24, 2013
- Abate by
- Jun 11, 2013
- Penalty
- Initial $1,200 · Current $720 Reduced
05270577136715939010
General-duty citation text
Construction Reference: 1926.59 NOTE: The requirements applicable to construction work under this section are identical to those set forth at § 1910.1200 of this chapter. 29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: a) The employer did not develop or implement a written hazard communication program in accordance with 29 CFR 1910.1200(e)(1) that would describe or include at least the following: 1) Requirement for labeling of containers of hazardous chemicals; 2) Material safety data sheet availability; 3) Training of employees; 4) A complete list of hazardous chemicals known to be in the workplace; 5) Methods to inform employees of the hazards on non-routine tasks; and 6) Methods to inform other employer(s) of material safety data sheet availability; the labeling system; and any precautionary measures to protect employees. On or about 27 March 2013, the employer did not develop a written hazard communication program. Masonry worker(s) were exposed to hazardous matter (pH 12-13) containing crystalline silica (up to 30%) while filling the open gaps between the bricks with new mortar. Ground worker(s) were exposed to hazardous substances including but not limited to Brixment Type N Masonry Cement (contains Portland Cement; Gypsum; Limestone; Hydrated Lime; Iron Oxide; Carbon Black and Crystalline Silica) and Western Miracle Lime Type S (contains Calcium Hydroxide; Magnesium Hydroxide; Dolomite; Magnesium Oxide) while mixing these ingredients along with sand and water into mortar.
Recent events (2)
- · I (S) $720
- · Z (S) $1200
1910.1200 H01
- Issued
- Apr 24, 2013
- Abate by
- Jun 11, 2013
- Penalty
- Initial $0 · Current $0
05270577136715939010
General-duty citation text
Construction Reference: 1926.59 NOTE: The requirements applicable to construction work under this section are identical to those set forth at § 1910.1200 of this chapter. 29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: a) On or about 27 March 2013, the employer did not provide the employee(s) with training regarding the health hazards of Crystalline Silica and Lime. Masonry worker(s) were exposed to hazardous matter (pH 12-13) containing crystalline silica (up to 30%) while filling the open gaps between the bricks with new mortar. Ground worker(s) were exposed to hazardous substances including but not limited to Brixment Type N Masonry Cement (contains Portland Cement; Gypsum; Limestone; Hydrated Lime; Iron Oxide; Carbon Black and Crystalline Silica) and Western Miracle Lime Type S (contains Calcium Hydroxide; Magnesium Hydroxide; Dolomite; Magnesium Oxide) while mixing these ingredients along with sand and water into mortar.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.102 A01
- Issued
- Apr 24, 2013
- Abate by
- May 6, 2013
- Penalty
- Initial $400 · Current $240 Reduced
05270577136715939010
General-duty citation text
29 CFR 1926.102(a)(1): Eye and face protective equipment were not used when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents. a) On or about 27 March 2013, the employer did not ensure that masonry worker(s) filling with mortar the open gaps between bricks used eye protection (safety glasses) to protect them against hazardous particulates [containing up to 30% crystalline silica]. Ground worker(s) were exposed to airborne dust generated during the mixing of Brixment Type N Masonry Cement (contains Portland Cement; Gypsum; Limestone; Hydrated Lime; Iron Oxide; Carbon Black and Crystalline Silica) Western Miracle Lime Type S (contains Calcium Hydroxide; Magnesium Hydroxide; Dolomite; Magnesium Oxide), sand and water to make mortar. None of workers was observed wearing safety glasses.
Recent events (2)
- · I (O) $240
- · Z (O) $400
More inspections at Pioneer Tuckpointing INC.
View Pioneer Tuckpointing INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238140)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338982812.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.