NATICK, MA —
OSHA Inspection: TEAM AVS, INC.
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of TEAM AVS, INC. in 16 TECH CIRCLE, NATICK, MA 01760 (NAICS 238210). OSHA activity number 339005647.
Where did this inspection happen?
- Establishment
- TEAM AVS, INC.
- Site address
- 16 TECH CIRCLE
- City
- NATICK
- State
- MA
- ZIP
- 01760
- Mailing
- 16 TECH CIRCLE, NATICK, MA 01760
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238210
- Employees
- 23
- Ownership type
- A
Citations
4 citations on file for this inspection.
1910.303 B02
- Issued
- Abate by
- Penalty
- Initial $1600.00 · Current $960.00 Reduced
General-duty citation text
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: (a) Location - Establishment On or about 4/15/13, multiple portable extension cords were connected to each other (daisy-chained) to power office equipment.
Recent events (2)
- — I (S) $960
- — Z (S) $1600
1910.305 A02 I
- Issued
- Abate by
- Penalty
- Initial $1600.00 · Current $0.00 Reduced
General-duty citation text
29 CFR 1910.305(a)(2)(i): Temporary electrical power and lighting installation(s) 600 volts, nominal, or less were used in prohibited manners: (a) Location - Establishment On or about 4/15/13, portable extension cords were used permanently in place of permanent wiring to power office equipment.
Recent events (2)
- — I (S) $0
- — Z (S) $1600
1910.305 G01 IV A
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: (a) Location - Establishment On or about 4/15/13, flexible cable was used for fixed wiring of an outlet that is used for test equipment.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.305 G01 IV B
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1910.305(g)(1)(iv)(B): Flexible cords and cables may not be used where run through holes in walls, ceilings or floors: (a) Location - Establishment On or about 4/15/13, a flexible electrical cable was run through a hole in ceiling tile to power an outlet. (b) Location - Establishment On or about 4/15/13, portable extension cords were run through ceiling tile to power office equipment.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections in this industry (NAICS 238210)
SOUTH FULTON, GA—2026-07-10
REEDWICK, LLC
NIAGARA FALLS, NY—2026-07-10
GAINES ELECTRICAL CONTRACTING, INC.
OGDENSBURG, NY—2026-07-10
S & L ELECTRIC, INC.
BOISE, ID—2026-07-09
POWERHOUSE ELECTRIC INC.
LYNCHBURG, VA—2026-07-09
WHITE ELECTRICAL SERVICES LLC
More inspections in MA
WORCESTER, MA—2026-07-10
QUINSIGAMOND COMMUNITY COLLEGE
FITCHBURG, MA—2026-07-10
KELLEY WOOD PRODUCTS, INC.
EVERETT, MA—2026-07-10
HORIZON RETAIL CONSTRUCTION INC
NORTON, MA—2026-07-09
DYNAMIC RESIDENTIAL ROOF MARKETING, LLC
NORTON, MA—2026-07-09
LM GENERAL CONSTRUCTION INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339005647.