Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: URQUILLA CONSTRUCTION, INC.

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of URQUILLA CONSTRUCTION, INC. in 520 FOREST STREET, MONROE, NY 10949 (NAICS 238140). OSHA activity number 339007023.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Urquilla Construction, INC. — free Get an email when a new federal OSHA severe-injury report for Urquilla Construction, INC. is published. One employer, no account, unsubscribe in one click.
Site address
520 FOREST STREET
City
MONROE
State
NY
ZIP
10949
Mailing
100 OLIVER STREET, NEWARK, NJ 07105
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
6
Ownership type
A

8 citations on file for this inspection.

1926.21 B02

Deleted Serious Gravity 10 1 instance 5 exposed
Issued
Sep 3, 2013
Abate by
Sep 11, 2013
Penalty
Initial $2,800 · Current $0 Reduced
29 CFR 1926.21(b)(2):  The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his/her environment to control or eliminate any hazards or other exposure to illness or injury:  (a) Third Story Floor - on or about April 10, 2013 - employees were not instructed in the recognition and avoidance of hazards associated with masonry work, including but not limited to: fall hazards and storage/use of flammable liquids.
Recent events (3)
  • — J (S) $0
  • — C (S) $2800
  • — Z (S) $2800

1926.150 C01 VI

Deleted Serious Gravity 1 1 instance 5 exposed
Issued
Sep 3, 2013
Abate by
Sep 11, 2013
Penalty
Initial $1,200 · Current $0 Reduced
29 CFR 1926.150(c)(1)(vi):  A fire extinguisher, rated not less than 10B, was not provided within 50 feet of wherever more than 5 gallons of flammable or combustible liquids or 5 pounds of flammable gas were being used on the jobsite:  (a) First Story Floor, South Side - on or about April 10, 2013 - no fire extinguisher was available within 50 feet of a storage area containing approximately 25 gallons of gasoline stored in safety cans and other containers (7 containers total).
Recent events (3)
  • — J (S) $0
  • — C (S) $1200
  • — Z (S) $1200

1926.152 A01

Deleted Serious Gravity 1 1 instance 5 exposed
Issued
Sep 3, 2013
Abate by
Sep 11, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.152(a)(1):  Containers and portable tanks used for the storage and handling of flammable and combustible liquids were not approved:   (a) First Story Floor, South Side - on or about April 10, 2013 - flammable fuel (gasoline) was stored in unapproved containers including, but not limited to: a plastic spring water bottle, an anti-freeze container, and gasoline storage cans with missing caps.
Recent events (3)
  • — J (S) $0
  • — C (S) $0
  • — Z (S) $0

1926.451 A01

Serious Gravity 10 1 instance 5 exposed
Issued
Sep 3, 2013
Abate by
Sep 11, 2013
Penalty
Initial $2,800 · Current $1,400 Reduced
29 CFR 1926.451(a)(1):  Each scaffold and/or scaffold component was not capable of supporting, without failure, its own weight and at least 4 times the maximum intended load applied or transmitted to it:    (a) Third Story Floor - on or about April 10, 2013 - a wood scaffold deck was erected on open-web steel bar joists which were inadequately braced and incapable of supporting the applied load(s).
Recent events (3)
  • — J (S) $1400
  • — C (S) $2800
  • — Z (S) $2800

1926.451 C02 II

Serious Gravity 10 1 instance 5 exposed
Issued
Sep 3, 2013
Abate by
Sep 11, 2013
Penalty
Initial $2,800 · Current $0 Reduced
29 CFR 1926.451(c)(2)(ii):  Unstable objects were used to support scaffolds or platform units:    (a) Third Story Floor - on or about April 10, 2013 - the scaffold deck was erected on open-web steel bar joists that were partially installed.  Bridging for joists was not installed to complete the structural stability.
Recent events (3)
  • — J (S) $0
  • — C (S) $2800
  • — Z (S) $2800

1926.451 F07

Serious Gravity 10 1 instance 5 exposed
Issued
Sep 3, 2013
Abate by
Sep 11, 2013
Penalty
Initial $2,800 · Current $0 Reduced
29 CFR 1926.451(f)(7):  Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person:    (a) Third Story Floor - on or about April 10, 2013 - the wood scaffold deck was not erected under the supervison of a competent person and by experienced and trained employees.
Recent events (3)
  • — J (S) $0
  • — C (S) $2800
  • — Z (S) $2800

1926.454 A

Serious Gravity 10 1 instance 5 exposed
Issued
Sep 3, 2013
Abate by
Sep 11, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.454(a):  The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:    (a) Third Story Floor - on or about April 10, 2013 - the employer did not train employees performing masonry work in recognition and avoidance of hazards associated with erection, loading, and use of a wood plank scaffold platform supported by open-web steel bar joists.
Recent events (3)
  • — J (S) $0
  • — C (S) $0
  • — Z (S) $0

1926.451 G01 VII

Serious Gravity 5 1 instance 5 exposed
Issued
Sep 3, 2013
Abate by
Sep 11, 2013
Penalty
Initial $2,400 · Current $0 Reduced
29 CFR 1926.451(g)(1)(vii):  Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section:    (a) Third Story Floor - on or about April 10, 2013 - a wood scaffold deck was erected at a 12 foot, eight inch elevation from the third story concrete slab was not equipped with any means of fall protection, such as guardrails or a personal fall arrest system.
Recent events (3)
  • — J (S) $0
  • — C (S) $2400
  • — Z (S) $2400

View Urquilla Construction, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339007023.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.