OSHA Inspection: TRITON MARINE CONSTRUCTION CORPORATION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of TRITON MARINE CONSTRUCTION CORPORATION in PIER B22-24, PEARL HARBOR, HI 96860 (NAICS 237990). OSHA activity number 339008435.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Triton Marine Construction Corporation — free Get an email when a new federal OSHA severe-injury report for Triton Marine Construction Corporation is published. One employer, no account, unsubscribe in one click.
Site address
PIER B22-24
City
PEARL HARBOR
State
HI
ZIP
96860
Mailing
2889 MOKUMOA ST., HONOLULU, HI 96819
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237990
Employees
21
Ownership type
A

3 citations on file for this inspection.

1926.502 I03

Other-than-serious 1 instance 3 exposed
Issued
Apr 22, 2013
Abate by
May 9, 2013
Penalty
Initial $3,500 · Current $1,500 Reduced
29 CFR 1926.502(i)(3): The hole cover was not secured when installed so as to prevent accidental displacement by the wind, equipment, or employees:    This violation was observed on April 16, 2013 at Pier B22, Pearl Harbor; where employees were exposed to a 7-foot fall hazard from not having secured the cover on a 2.0 ft by 1.5 ft concrete hole.
Recent events (2)
  • — I (O) $1500
  • — Z (S) $3500

1926.855 F

Deleted Serious Gravity 5 1 instance 3 exposed
Issued
Apr 22, 2013
Abate by
May 9, 2013
Penalty
Initial $3,500 · Current $0 Reduced
29 CFR 1926.855(f): When floor arches were being removed, employees were allowed in the area directly underneath, and such an area was not barricaded to prevent access to it.  This violation was observed on April 16, 2013 at Pier B22, Pearl Harbor; where the area was not properly barricaded and employees were allowed access to this area where the floor was being removed.
Recent events (2)
  • — I (S) $0
  • — Z (S) $3500

1926.405 A02 II I

Deleted Other-than-serious 1 instance 3 exposed
Issued
Apr 22, 2013
Abate by
May 9, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.405(a)(2)(ii)(I): Flexible cords and cables used for temporary wiring were not protected from damage:  This violation was observed on April 16, 2013 at Pier B22, Pearl Harbor; when employees were operating portable tools powered by flexible cords that passed through a pinch point and were not protected to prevent damage.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View Triton Marine Construction Corporation's full OSHA safety record →