PEARL HARBOR, HI —
OSHA Inspection: TRITON MARINE CONSTRUCTION CORPORATION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of TRITON MARINE CONSTRUCTION CORPORATION in PIER B22-24, PEARL HARBOR, HI 96860 (NAICS 237990). OSHA activity number 339008435.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- TRITON MARINE CONSTRUCTION CORPORATION
- Site address
- PIER B22-24
- City
- PEARL HARBOR
- State
- HI
- ZIP
- 96860
- Mailing
- 2889 MOKUMOA ST., HONOLULU, HI 96819
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 237990
- Employees
- 21
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.502 I03
- Issued
- Apr 22, 2013
- Abate by
- May 9, 2013
- Penalty
- Initial $3,500 · Current $1,500 Reduced
General-duty citation text
29 CFR 1926.502(i)(3): The hole cover was not secured when installed so as to prevent accidental displacement by the wind, equipment, or employees: This violation was observed on April 16, 2013 at Pier B22, Pearl Harbor; where employees were exposed to a 7-foot fall hazard from not having secured the cover on a 2.0 ft by 1.5 ft concrete hole.
Recent events (2)
- — I (O) $1500
- — Z (S) $3500
1926.855 F
- Issued
- Apr 22, 2013
- Abate by
- May 9, 2013
- Penalty
- Initial $3,500 · Current $0 Reduced
General-duty citation text
29 CFR 1926.855(f): When floor arches were being removed, employees were allowed in the area directly underneath, and such an area was not barricaded to prevent access to it. This violation was observed on April 16, 2013 at Pier B22, Pearl Harbor; where the area was not properly barricaded and employees were allowed access to this area where the floor was being removed.
Recent events (2)
- — I (S) $0
- — Z (S) $3500
1926.405 A02 II I
- Issued
- Apr 22, 2013
- Abate by
- May 9, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.405(a)(2)(ii)(I): Flexible cords and cables used for temporary wiring were not protected from damage: This violation was observed on April 16, 2013 at Pier B22, Pearl Harbor; when employees were operating portable tools powered by flexible cords that passed through a pinch point and were not protected to prevent damage.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Triton Marine Construction Corporation
View Triton Marine Construction Corporation's full OSHA safety record →
More inspections in this industry (NAICS 237990)
More inspections in HI
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339008435.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.