HIALEAH, FL —
OSHA Inspection: INTEGRATED COMPONENTS CORPORATION
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of INTEGRATED COMPONENTS CORPORATION in 2592 WEST 78TH ST., HIALEAH, FL 33016 (NAICS 326199). OSHA activity number 339023053.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- INTEGRATED COMPONENTS CORPORATION
- Site address
- 2592 WEST 78TH ST.
- City
- HIALEAH
- State
- FL
- ZIP
- 33016
- Mailing
- 2592 WEST 78TH ST., HIALEAH, FL 33016
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 326199
- Employees
- 20
- Ownership type
- A
Citations
3 citations on file for this inspection.
1910.178 P01
- Issued
- Jun 5, 2013
- Abate by
- Jul 1, 2013
- Penalty
- Initial $2,000 · Current $1,200 Reduced
General-duty citation text
29 CFR 1910.178(p)(1): Powered industrial truck(s) found to be in need of repair, defective, or in any way unsafe had not been taken out of service until restored to safe operating condition(s): On or about April 24th, 2013, at the above address, the Nissan Forklift was not taken out of service while having a damaged back-up alarm.
Recent events (2)
- — I (S) $1200
- — Z (S) $2000
1910.212 A03 II
- Issued
- Jun 5, 2013
- Abate by
- Jul 9, 2013
- Penalty
- Initial $1,600 · Current $960 Reduced
General-duty citation text
29 CFR 1910.212(a)(3)(ii): The point of operation of machines whose operation exposed an employee to injury, was not guarded: On or about April 24th, 2013, at the above address, a lathe was not guarded at the point of operation.
Recent events (2)
- — I (S) $960
- — Z (S) $1600
1910.305 G02 III
- Issued
- Jun 5, 2013
- Abate by
- Jun 5, 2013
- Penalty
- Initial $1,600 · Current $960 Reduced
General-duty citation text
29 CFR 1910.305(g)(2)(iii): Flexible cords were not connected to devices and fittings so that tension would not be transmitted to joints or terminal screws: On or about April 24th, 2013, at the above address, a plastic grinder machine power cord was not providing strain relief.
Recent events (2)
- — I (S) $960
- — Z (S) $1600
More inspections at Integrated Components Corporation
View Integrated Components Corporation's full OSHA safety record →
More inspections in this industry (NAICS 326199)
More inspections in FL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339023053.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.