OSHA Inspection: BDR WELL SERVICE, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of BDR WELL SERVICE, LLC in BULLINGER 1-30 SWD, MANNING, ND 58642 (NAICS 213112). OSHA activity number 339024093.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch BDR Well Service, LLC — free Get an email when a new federal OSHA severe-injury report for BDR Well Service, LLC is published. One employer, no account, unsubscribe in one click.
Site address
BULLINGER 1-30 SWD
City
MANNING
State
ND
ZIP
58642
Mailing
P.O. BOX 438, MEDORA, ND 58645
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
213112
Employees
6
Ownership type
A

1 citation on file for this inspection.

5(a)(1)

Serious Gravity 5 1 instance 1 exposed
Issued
Jul 18, 2013
Abate by
Jul 22, 2013
Penalty
Initial $2,000 · Current $1,400 Reduced
Section 5(a)(1): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to fall hazards:   (a)   On or about April 25, 2013, and at times prior to that date, for employees exposed to an approximate 60-foot fall hazard while working from the derrickman's working platform where the employer had installed an emergency egress "Geronimo" safety slide anchor approximately 90 feet from the wellbore and was secured with only one cable clamp at Bullinger 1-30 SWD, Dickinson, ND.  Abatement Note:  Among other methods, feasible and acceptable abatement methods to correct the hazard would be for the employer to correctly install the "Geronimo" safety slide ground anchor out to a minimum distance of twice the height of the derrickman's working platform to create the recommended maximum angle of descent or to install a controlled descent apparatus to limit the distance required by a standard "Geronimo" safety slide ground anchor in accordance with Geronimo Manufacturing, Inc. Operators Manual, pages 9-11, INSTALLATION, Illustrations 1 and 3. Also the (API) American Petroleum Institute Recommended Practice 54, Third Edition, "Recommended Practice for Occupational Safety for Oil and Gas Well Drilling and Servicing Operations", section 6.10, AUXILLARY ESCAPE, subsection 6.10.1a, "It is recommended that the ground anchor point of the escape line should be located a minimum lateral distance from the derrick or mast equal to two times the height of the work platform." In addition, to correct the hazard would be for the employer to correctly install and secure the "Geronimo" safety slide ground anchor cable by using at least three (API) American Petroleum Institute approved cable clamps in accordance with Geronimo Manufacturing, Inc. Operators Manual, pages 9-11, "INSTALLATION", Illustrations 2 and 3.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2000

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339024093.