Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,198,201Inspections Most recent open 2026-08-31 Last loaded 2026-09-03

OSHA Inspection: ACAI INVESTMENTS ,LLC

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of ACAI INVESTMENTS ,LLC in 7803 W 25TH CT, HIALEAH, FL 33016 (NAICS 326121). OSHA activity number 339032443.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Acai Investments ,LLC for free Get an email when a new federal OSHA severe-injury report for Acai Investments ,LLC is published. One employer, no account, unsubscribe in one click.
Site address
7803 W 25TH CT
City
HIALEAH
State
FL
ZIP
33016
Mailing
7803 W 25TH CT, HIALEAH, FL 33016
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
326121
Employees
6
Ownership type
Private (A)

6 citations on file for this inspection.

1910.23 C01

Serious Gravity 5 1 instance 1 exposed
Issued
May 16, 2013
Abate by
Jun 19, 2013
Penalty
Initial $2,000 · Current $1,200 Reduced
29 CFR 1910.23(c)(1): Open-sided floors and/or platforms four feet or more above adjacent floor or ground level were not guarded with standard railings (or equivalent) and toeboards:    On or about April 26, 2013, at the above addressed jobsite, an overhead storage platform, 10 feet above ground, was not provided with guard rails.
Recent events (2)
  • · I (S) $1200
  • · Z (S) $2000

1910.147 C01

Serious Gravity 10 1 instance 3 exposed
Issued
May 16, 2013
Abate by
Jun 19, 2013
Penalty
Initial $2,800 · Current $1,680 Reduced
29 CFR 1910.147(c)(1): The employer did not establish a program consisting of an energy control procedure, employee training and periodic inspections to ensure that before any employee performed any servicing or maintenance on a machine or equipment where the unexpected energing, startup or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source and rendered inoperative:    On or about April 26, 2013, at the above addressed jobsite, the employer had not established a lockout tagout program to ensure the isolation of energy during repair and maintenance of the ZED-300-50 and ZED 300-60 thermoformers.
Recent events (2)
  • · I (S) $1680
  • · Z (S) $2800

1910.212 A01

Serious Gravity 5 2 instances 2 exposed
Issued
May 16, 2013
Abate by
Jun 12, 2013
Penalty
Initial $2,000 · Current $1,200 Reduced
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks:    A- On or about April 26, 2013, at the above addressed jobsite, the Zed 300-60 thermoformer did not have guards for the plastic pick up section, and the rollers that picked up the leftover plastic.     B- On or about April 26, 2013 The Zed 300-50 thermoformer did not have guards in front of the heating element section.
Recent events (2)
  • · I (S) $1200
  • · Z (S) $2000

1910.215 A04

Serious Gravity 1 1 instance 1 exposed
Issued
May 16, 2013
Abate by
Jun 19, 2013
Penalty
Initial $1,200 · Current $720 Reduced
29 CFR 1910.215(a)(4): Grinding machinery was not used with work rest(s) to support offhand grinding work:    On or about April 26, 2013, at the aboved adressed location, an Ohio Forge bench grinder did not have a work rest for the employees to grind various pieces of metal.
Recent events (2)
  • · I (S) $720
  • · Z (S) $1200

1910.305 G01 IV A

Other-than-serious 2 instances 4 exposed
Issued
May 16, 2013
Abate by
Jun 12, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure:  A- On or about April 26, 2013, at the above addressed jobsite, at the bench grinder station, extension cords were used as permanent wiring.  B- On or about April 26, 2013, at the above adressed jobsite, at the Zed 300-60 station, flexible cords were used as permanent wiring.
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

1910.334 A02 II

Other-than-serious 2 instances 4 exposed
Issued
May 16, 2013
Abate by
Jun 12, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.334(a)(2)(ii): There was a defect or evidence of damage that could have exposes an employee to injury and the defective or damaged item was not removed from service:  A- On or about April 26, 2013, at the above addressed jobsite, at the work bench where the bench grinder is located, the employer had extension cords that were frayed.  B- On or about April 26, 2013, at the above addressed jobsite, at the ZED 300-60 station, the employer had extensioncords that were frayed.
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

View Acai Investments ,LLC's full OSHA safety record →