Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: SCHEAR CONSTRUCTION, LLC

Unprogrammed Other inspection · Health discipline

On , OSHA opened an unprogrammed Other health inspection of SCHEAR CONSTRUCTION, LLC in 2619 FORUM BLVD, FORT MYERS, FL 33905 (NAICS 238140). OSHA activity number 339034365.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Schear Construction, LLC — free Get an email when a new federal OSHA severe-injury report for Schear Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
2619 FORUM BLVD
City
FORT MYERS
State
FL
ZIP
33905
Mailing
5490 LEE ST, LEHIGH ACRES, FL 33971
Inspection type
Unprogrammed Other (I)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
32
Ownership type
A

2 citations on file for this inspection.

1910.134

Other-than-serious 3 instances 3 exposed
Issued
May 15, 2013
Abate by
Jul 2, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.134 App D: Employer did not provide employee(s) with the information in Appendix D of this standard when employer allows the voluntary use of filtering face piece respirators.  a)a) At the stucco cement mixer area, employees used 3M, N95 TC-84A-4271,voluntarily while they were mixing cement with contain up to 5% crystalline silica, on or about April 29, 2013.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.1200 H01

Other-than-serious 1 instance 8 exposed
Issued
May 15, 2013
Abate by
Jul 2, 2013
Penalty
Initial $765 · Current $459 Reduced
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: (Construction Reference: 1926.59)   a)    At the construction site, employees were not trained when they used chemicals such as stucco cement which contained 40-55 % Portland cement, on or about April 29, 2013.
Recent events (2)
  • — I (O) $459
  • — Z (O) $765

View Schear Construction, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339034365.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.