Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: OMAR PEREZ GENERAL CONSTRUCTION INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of OMAR PEREZ GENERAL CONSTRUCTION INC. in 2655 W. CARMEN AVE., CHICAGO, IL 60625 (NAICS 238160). OSHA activity number 339038242.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Omar Perez General Construction INC. — free Get an email when a new federal OSHA severe-injury report for Omar Perez General Construction INC. is published. One employer, no account, unsubscribe in one click.
Site address
2655 W. CARMEN AVE.
City
CHICAGO
State
IL
ZIP
60625
Mailing
5656 S. CALIFORNIA AVE., CHICAGO, IL 60629
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
4
Ownership type
A

5 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 1 exposed
Issued
Jul 31, 2013
Abate by
Sep 3, 2013
Penalty
Initial $400 · Current $400
29 CFR 1903.19(c)(1):  The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:    Omar Perez General Construction, Inc. failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected:     Citation Number                     Item Number                           Abatement Date  01                                            01                                            05/29/2013 01                                            02                                            05/29/2013 01                                            03                                            05/29/2013 01                                            04                                            06/19/2013    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (O) $400

1926.150 C01 VI

Serious Gravity 5 4 instances 4 exposed
Issued
May 16, 2013
Abate by
May 29, 2013
Penalty
Initial $1,600 · Current $1,600
29 CFR 1926.150(c)(1)(vi):  A fire extinguisher, rated not less than 10B, was not provided within 50 feet of wherever more than 5 gallons of flammable or combustible liquids or 5 pounds of flammable gas were being used on the jobsite:    a)  A fire extinguisher was not provided where employees were using four 20 pound propane tanks to fuel four roofing torches.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (S) $1600

1926.501 B04 I

Serious Gravity 10 1 instance 4 exposed
Issued
May 16, 2013
Abate by
May 29, 2013
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.501(b)(4)(i):  Each employee on walking/working surfaces was not protected from falling through holes (including skylights), more than six feet (1.8 m) above lower levels, by personal fall arrest systems, covers, or guardrail systems erected around such holes:    a)  Employees were exposed to falls of greater than 10 feet while working around unprotected skylights.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $2800

1926.501 B10

Serious Gravity 10 1 instance 4 exposed
Issued
May 16, 2013
Abate by
May 29, 2013
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.501(b)(10):  Each employee engaged in roofing activities on low-slope roofs with unprotected sides and edges 6 feet or more above lower levels, was not protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and fuardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system.  Or, on roofs 50-feet (15.25 m) or less in width, each employee was not protected by use of a monitoring system:    a)  Employees engaged in roofing activities were exposed to falls from a three story building.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $2800

1926.503 A01

Serious Gravity 5 1 instance 4 exposed
Issued
May 16, 2013
Abate by
Jun 19, 2013
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.503(a)(1):  The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards:   a)  Employees were exposed to fall hazards while performing roofing work and the employer did not provide a training program to recognize fall hazards and the procedures to be followed in order to minimize those hazards.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (S) $2000

View Omar Perez General Construction INC.'s full OSHA safety record →