OSHA Inspection: BAC, LLC, MASONRY & LANDSCAPING

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of BAC, LLC, MASONRY & LANDSCAPING in 1700 EUCLID STREET, NW, WASHINGTON, DC 20009 (NAICS 238140). OSHA activity number 339054215.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch BAC, LLC, Masonry & Landscaping for free Get an email when a new federal OSHA severe-injury report for BAC, LLC, Masonry & Landscaping is published. One employer, no account, unsubscribe in one click.
Site address
1700 EUCLID STREET, NW
City
WASHINGTON
State
DC
ZIP
20009
Mailing
888 16TH STREET, SUITE 800, NW,, WASHINGTON, DC 20006
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
6
Ownership type
Private (A)

5 citations on file for this inspection.

1926.102 A01

Serious Gravity 1 1 instance 1 exposed
Issued
May 30, 2013
Abate by
Jun 5, 2013
Penalty
Initial $1,200 · Current $1,200
29 CFR 1926.102(a)(1): Eye and face protective equipment were not used when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents:     a) North Side of the Building - A laborer was observed on a tubular welded frame scaffold performing brick washing without using eye protection exposing him to a potential eye injury, on or about 05/06/13.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $1200
  • · Z (S) $1200

1926.451 B03

Deleted Serious Gravity 1 1 instance 1 exposed
Issued
May 30, 2013
Abate by
Jun 5, 2013
Penalty
Initial $1,200 · Current $0 Reduced
29 CFR 1926.451(b)(3): The front edge of all platforms was not 14 inches (36 cm) or less from the face of the work, and no guardrail systems were erected along the front edge and/or no personal fall arrest systems were used in accordance with paragraph (g) of this section to protect employees from falling:   a) North Side of the Building - A laborer was observed straddling between a tubular welded frame scaffold and the window sill which were 30 inches apart exposing him to a 51 inch fall on to the porch overhang, on or about 05/06/13.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $0
  • · Z (S) $1200

1926.451 E01

Serious Gravity 1 2 instances 2 exposed
Issued
May 30, 2013
Abate by
Jun 5, 2013
Penalty
Initial $1,200 · Current $1,200
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.  Cross-braces were used as a means of access.   a) North Side of the Building - A laborer were observed on a tubular welded frame scaffold climbing the cross braces to reach the protective plastic sheet exposing them to a 50 inch fall onto the basement patio, on or about 05/06/13.   b) South Side of the Building - Laborers were observed on a tubular welded frame scaffold climbing the cross braces to access the ground below exposing them to a 8 foot fall onto the basement patio, on or about 05/06/13.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $1200
  • · Z (S) $1200

1926.451 G04 I

Serious Gravity 5 1 instance 1 exposed
Issued
May 30, 2013
Abate by
Jun 5, 2013
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms.   a) North Side of the Building - A laborer was observed on a tubular welded frame scaffold which was not equipped with an end rail fall protection exposing him to a 19 foot 6 inch fall hazard, on or about 05/06/13.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $2000
  • · Z (S) $2000

1926.1052 C01

Deleted Serious Gravity 1 2 instances 2 exposed
Issued
May 30, 2013
Abate by
Jun 5, 2013
Penalty
Initial $1,200 · Current $0 Reduced
29 CFR 1926.1052(c)(1): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with at least one handrail and one stair rail system along each unprotected side or edge:    a) North Side Entrance - A foreman and some laborers were observed entering the building where the entrance stairs were not equipped with a standard hand rail exposing them to a 3 foot fall hazard, on or about 05/06/13.   b) Throughout the Building - Various workers were observed using the interior stairs which were not equipped with a standard hand rail exposing them to an 11 foot fall hazard, on or about 05/06/13.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $0
  • · Z (S) $1200

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339054215.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.