JACKSONVILLE, FL —
OSHA Inspection: CUSTOM MARINE COMPONENTS, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of CUSTOM MARINE COMPONENTS, INC. in 13755 ATLANTIC BLVD, JACKSONVILLE, FL 32225 (NAICS 332999). OSHA activity number 339055394.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CUSTOM MARINE COMPONENTS, INC.
- Site address
- 13755 ATLANTIC BLVD
- City
- JACKSONVILLE
- State
- FL
- ZIP
- 32225
- Mailing
- 13755 ATLANTIC BLVD, JACKSONVILLE, FL 32225
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332999
- Employees
- 12
- Ownership type
- A
Citations
5 citations on file for this inspection.
5(a)(1)
- Issued
- May 13, 2013
- Abate by
- Jun 28, 2013
- Penalty
- Initial $1,200 · Current $600 Reduced
General-duty citation text
OSH ACT of 1970 Section (5)(a)(1): Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to being struck by flying projectile hazards due to possible mechanical failure of plastic polyvinyl chloride (PVC) pipe: a. On or about May 8, 2013, in the fabrication shop, employees were exposed to being struck by flying plastic projectiles due to possible mechanical failure/breakdown of plastic polyvinyl chloride (PVC) piping. Among other methods, the following are feasible and acceptable methods to correct this hazard; 1. Replace the current PVC compressed air piping system with materials suitable for the maximum air pressure as recommended by the Plastic Pipe Institute. 2. Follow the American National Standard Institute/American Society of Mechanical Engineers (ANSI/ASME) B31.1-2007 Power Piping as applicable. 3. Encase or cover existing PVC pipe in shatter-resistant material.
Recent events (2)
- — I (S) $600
- — Z (S) $1200
1910.178 L01 I
- Issued
- May 13, 2013
- Abate by
- Jun 28, 2013
- Penalty
- Initial $1,200 · Current $600 Reduced
General-duty citation text
29 CFR 1910.178(l)(1)(i): The employer did not ensure that each powered industrial truck operator is competent to operate a powered industrial truck safely, as demonstrated by the successful completion of the training and evaluation specified in this paragraph (l): a. On or about May 8, 2013, in the fabrication shop, operators using the Hyster forklift had not been trained nor were they evaluated.
Recent events (2)
- — I (S) $600
- — Z (S) $1200
1910.252 A02 XIII
- Issued
- May 13, 2013
- Abate by
- Jun 28, 2013
- Penalty
- Initial $1,530 · Current $765 Reduced
General-duty citation text
29 CFR 1910.252(a)(2)(xiii): The employer did not recognize its responsibility for the safe usage of cutting or welding equipment on its property, in accordance with 29 CFR 1910.252 (a)(2)(xiii)(A) through 29 CFR 1910.252(a)(2)(xiii)(D) a. On or about May 8, 2013, in the T-top installation area, cutting equipment had broken guages and did not have flashback arrestors, exposing employees to an explosion hazard.
Recent events (2)
- — I (S) $765
- — Z (S) $1530
1910.305 G01 IV A
- Issued
- May 13, 2013
- Abate by
- Jun 28, 2013
- Penalty
- Initial $1,200 · Current $600 Reduced
General-duty citation text
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: a. On or about May 8, 2013, in the fabrication shop, the Edwards 14GA Truecut gulliotine electric shear was hard wired into the building electrical grid using flexible cord, exposing employees to an electrical shock hazard.
Recent events (2)
- — I (S) $600
- — Z (S) $1200
1910.305 B02 I
- Issued
- May 13, 2013
- Abate by
- May 13, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.305(b)(2)(i): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose: a. On or about May 8, 2013, in the fabrication shop, behind the Edwards 14GA Truecut guillotine shear, the electrical conduit box did not have a cover.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Custom Marine Components, INC.
View Custom Marine Components, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 332999)
More inspections in FL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339055394.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.