OSHA Inspection: BUCHANAN SEPTIC TANKS

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of BUCHANAN SEPTIC TANKS in 15648 HWY 29, BUCHANAN DAM, TX 78609 (NAICS 327390). OSHA activity number 339062358.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Buchanan Septic Tanks for free Get an email when a new federal OSHA severe-injury report for Buchanan Septic Tanks is published. One employer, no account, unsubscribe in one click.
Site address
15648 HWY 29
City
BUCHANAN DAM
State
TX
ZIP
78609
Mailing
15648 HWY 29, BUCHANAN DAM, TX 78609
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
327390
Employees
13
Ownership type
Private (A)

8 citations on file for this inspection.

1910.23 C01

Serious Gravity 5 1 instance 13 exposed
Issued
May 23, 2013
Abate by
Jun 2, 2013
Penalty
Initial $2,000 · Current $1,200 Reduced
29 CFR 1910.23(c)(1): Open-sided floors and/or platforms four feet or more above adjacent floor or ground level were not guarded with standard railings (or equivalent):   On or about May 10, 2013, the loft area, approximately eight (8) feet five (5) inches above the office and break area used for storage was not guarded with standard railing, exposing employees to a fall hazard.    Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that every open-side floor platform four (4) feet or more above adjacent floor or ground level shall be guarded by a standard railing or its equivalent.
Recent events (2)
  • · I (S) $1200
  • · Z (S) $2000

1910.23 D01

Serious Gravity 5 1 instance 13 exposed
Issued
May 23, 2013
Abate by
Jun 2, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.23(d)(1): Flights of stairs having four or more risers were not equipped with a standard railing as specified in paragraphs (d)(1)(i) through (v) of this section:   On or about May 10, 2013, the stairs leading to loft area, up to approximately eight (8) feet five (5) inches above the office and break area used for storage was not guarded with standard railing, exposing employees to a fall hazard.    Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that every open-side floor platform four (4) feet or more above adjacent floor or ground level shall be guarded by a standard railing or its equivalent.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1910.243 C03

Serious Gravity 1 1 instance 3 exposed
Issued
May 23, 2013
Abate by
Jun 2, 2013
Penalty
Initial $1,200 · Current $720 Reduced
29 CFR 1910.243(c)(3): Abrasive wheels used on vertical portable grinder(s) (right angle head grinders) were not provided with safety guard(s) having a maximum exposure angle of 180 degrees and located between the operator and wheel:   On or about May 8, 2013, a portable angle grinder was used without guarding, exposing employees the hazards of being caught in the spinning wheel or struck by debris of an exploding wheel.    Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that grinders are used with their guarding in place.
Recent events (2)
  • · I (S) $720
  • · Z (S) $1200

1910.305 G01 IV A

Serious Gravity 1 1 instance 13 exposed
Issued
May 23, 2013
Abate by
Jun 2, 2013
Penalty
Initial $1,200 · Current $720 Reduced
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure:   On or about May 10, 2013, flexible 110 volt orange extension cords were used as permanent wiring to power two receptacle boxes in the maintenance area, exposing employees to an electrical shock hazard.    Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that flexible cords are not affixed to building surfaces and used as permanent wiring.
Recent events (2)
  • · I (S) $720
  • · Z (S) $1200

1910.305 G02 II

Serious Gravity 1 1 instance 13 exposed
Issued
May 23, 2013
Abate by
Jun 2, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.305(g)(2)(ii): Flexible cords were not used only in continuous lengths without splice or tap:  On or about May 10, 2013, two 110 volt receptacle boxes were powered by a spliced extension cord, exposing employees to an electrical shock hazard.    Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that flexible cords are used in continuous lengths.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1910.303 B07 IV

Serious Gravity 1 1 instance 13 exposed
Issued
May 23, 2013
Abate by
Jun 2, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.303(b)(7)(iv): There were damaged parts that adversely affected safe operation or mechanical strength of the equipment, such as parts that were broken, bent, cut, or deteriorated by corrosion, chemical action, or overheating:  On or about February 28, 2013, an extension cord spliced into and powering two 110 volt receptacle boxes had damage to the outer sheathing in multiple locations, exposing employees to an electrical shock hazard.    Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that all damaged parts that may adversely affect safe operation or mechanical strength of the equipment, such as parts that are broken, bent, cut, or deteriorated by corrosion, chemical action, or overheating are repaired or replaced.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1910.305 B02 I

Serious Gravity 1 1 instance 13 exposed
Issued
May 23, 2013
Abate by
Jun 2, 2013
Penalty
Initial $1,200 · Current $720 Reduced
29 CFR 1910.305(b)(2)(i): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose:   On or about May 10, 2013, a junction box containing 220 volt wiring powering a stove in the break area of the facility was missing its faceplate, exposing employees to an electrical shock hazard.       Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that all pull boxes, junction boxes, and fittings are equipped with the appropriate covers and are installed so that there are no gaps or openings.
Recent events (2)
  • · I (S) $720
  • · Z (S) $1200

1910.305 G02 III

Serious Gravity 1 2 instances 13 exposed
Issued
May 23, 2013
Abate by
Jun 2, 2013
Penalty
Initial $1,200 · Current $720 Reduced
29 CFR 1910.305(g)(2)(iii): Flexible cords were not connected to devices and fittings so that tension would not be transmitted to joints or terminal screws:  On or about May 10, 2013, the flexible cords in the facility show signs of strain relief issues.  Employees were exposed to an electric shock hazard.     a:  The outer sheathing of the cord for the Dewalt angle grinder fitted with a wire brush had gaps where the cord met the plug and where the cord met the tool exposing the inner wiring.     b:  The outer sheathing of the cord for the Black and Decker angle grinder fitted with a grinding wheel had a gap where the cord met the tool exposing the inner wiring.    Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that flexible cords are provided with strain relief.
Recent events (2)
  • · I (S) $720
  • · Z (S) $1200

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339062358.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.