WASHINGTON, DC —
OSHA Inspection: FREDDY CONSTRUCTION INC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of FREDDY CONSTRUCTION INC in HANSBERRY CT, WASHINGTON, DC 20018 (NAICS 238130). OSHA activity number 339064834.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- FREDDY CONSTRUCTION INC
- Site address
- HANSBERRY CT
- City
- WASHINGTON
- State
- DC
- ZIP
- 20018
- Mailing
- 9218 MORLEY RD, LANHAM, MD 20706
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 20
- Ownership type
- A
Citations
6 citations on file for this inspection.
1926.404 F06
- Issued
- Jun 10, 2013
- Abate by
- Jun 10, 2013
- Penalty
- Initial $1,600 · Current $0 Reduced
General-duty citation text
29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous: a) On or about May 13, 2013; Generator ground level; employees were using an extension cord that had an open ground. The extension cord was used to provide power to equipment such as but not limited to portable saws.
Recent events (2)
- — I (S) $0
- — Z (S) $1600
1926.501 B13
- Issued
- Jun 10, 2013
- Abate by
- Jun 10, 2013
- Penalty
- Initial $2,800 · Current $0 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) On or about May 13, 2013; roof area; employees working on installing the decking on the roof were not tied off, not properly tied off or were not tied to the anchor.
Recent events (2)
- — I (S) $0
- — Z (S) $2800
1926.1052 C01 I
- Issued
- Jun 10, 2013
- Abate by
- Jun 28, 2013
- Penalty
- Initial $1,200 · Current $0 Reduced
General-duty citation text
29 CFR 1926.1052(c)(1)(i): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with at least one hand rail: a) On or about May 13, 2013; stairways at site; stairway used to access the upper floors were not equipment with hand-rails. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $1200
1926.1053 B13
- Issued
- Jun 10, 2013
- Abate by
- Jun 28, 2013
- Penalty
- Initial $2,400 · Current $0 Reduced
General-duty citation text
29 CFR 1926.1053(b)(13): The top or top step of a stepladder was used as a step: a) On May 13, 2013; Third floor; employees were using the top step of the step ladder to either access the work area, come down the roof area or while handing material to other employees working on the roof area. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $2400
1926.1053 B01
- Issued
- Jun 10, 2013
- Abate by
- Jun 28, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1053(b)(1): Portable ladders were used for access to an upper landing surface and the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface to which the ladder was used to gain access: a) On or about May 13, 2013; third floor; employees were using step ladders that were to short too access the roof area; the step ladders when opened fell an estimated four feet below the top plate. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1053 B04
- Issued
- Jun 10, 2013
- Abate by
- Jun 28, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1053(b)(4): Ladder(s) were used for purposes other than the purpose for which they were designed: a) On or about May 13, 2013; third floor; employee was using a step ladder in closed position to access the roof area. Step ladders are designed to be used in the open position. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at Freddy Construction INC
View Freddy Construction INC's full OSHA safety record →
More inspections in this industry (NAICS 238130)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339064834.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.