NEW STANTON, PA ·
OSHA Inspection: GENERAL NUCLEAR CORPORATION
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of GENERAL NUCLEAR CORPORATION in 3519 WHEELER STREET, NEW STANTON, PA 15672 (NAICS 332710). OSHA activity number 339076408.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- GENERAL NUCLEAR CORPORATION
- Site address
- 3519 WHEELER STREET
- City
- NEW STANTON
- State
- PA
- ZIP
- 15672
- Mailing
- 3519 WHEELER STREET, NEW STANTON, PA 15672
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332710
- Employees
- 45
- Ownership type
- Private (A)
Citations
2 citations on file for this inspection.
1910.147 C04 I
- Issued
- Jul 12, 2013
- Abate by
- Aug 16, 2013
- Penalty
- Initial $2,100 · Current $1,350 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) In the Facility, on or about May 21, 2013 - The employer did not develop and document machine specific procedures for the control of potentially hazardous energy, including but not limited to grinders, conventional lathes, press and milling machines.
Recent events (2)
- · I (S) $1350
- · Z (S) $2100
1910.1200 E01
- Issued
- Jul 12, 2013
- Abate by
- Aug 16, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: a) In the Facility, on or about May 21, 2013 - The employer did not develop, implement and/or maintain a written hazard communication program at the workplace. Employees work with hazardous materials including but not limited to lubricants and oils.
Recent events (2)
- · I (O) $0
- · Z (O) $0
More inspections at General Nuclear Corporation
View General Nuclear Corporation's full OSHA safety record →
More inspections in this industry (NAICS 332710)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339076408.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.