THE WOODLANDS, TX ·
OSHA Inspection: MANUEL ZAVALA
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of MANUEL ZAVALA in FM 1488, THE WOODLANDS, TX 77384 (NAICS 238160). OSHA activity number 339078172.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MANUEL ZAVALA
- Site address
- FM 1488
- City
- THE WOODLANDS
- State
- TX
- ZIP
- 77384
- Mailing
- 22108 CAROL ROAD, NEW CANEY, TX 77357
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 3
- Ownership type
- Private (A)
Citations
3 citations on file for this inspection.
1926.451 B01
- Issued
- Jun 4, 2013
- Abate by
- Jun 10, 2013
- Penalty
- Initial $2,000 · Current $2,000
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): The employer does not ensure that the scaffold was fully planked during construction work. This violation was observed on or about May 21, 2013, on the south side of a commercial building where employees were exposed to a fall hazard when installing metal flashing material without a fully planked scaffold. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that each platform on all working levels of scaffolds are fully planked or decked between the front uprights and the guardrail supports as specidied in paragraphs 1926.451(b)(1)(i)-(ii).
Recent events (1)
- · Z (S) $2000
1926.451 E01
- Issued
- Jun 4, 2013
- Abate by
- Jun 10, 2013
- Penalty
- Initial $2,000 · Current $2,000
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface was not used: The employer does not provide employees with access to the scaffold to the upper level of the scaffold. This violation was observed on or about May 21, 2013, on the east side of a newly built commercial building where employees were exposed to a fall hazard when accessing the scaffold platform at a height of 15 feet without a ladder. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that when scaffold platforms are 2 feet above or below a point of access, portable ladders, hook-on ladders, attachable ladders or similar surface is used.
Recent events (1)
- · Z (S) $2000
1926.451 G04 I
- Issued
- Jun 4, 2013
- Abate by
- Jun 10, 2013
- Penalty
- Initial $2,000 · Current $2,000
General-duty citation text
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms. The employer does not install guard rails on the scaffold during construction work. This violation was observed on or about May 21, 2013, on a newly built commercial building where employees were exposed to a fall hazard when required to do masonry work from a platform of 15 feet without a guard rail system . Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that guardrail systems are install along open sides and ends of platforms.
Recent events (1)
- · Z (S) $2000
More inspections at Manuel Zavala
View Manuel Zavala's full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339078172.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.