MIAMI, FL —
OSHA Inspection: DELGADO BROTHERS CONSTRUCTION LLC
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of DELGADO BROTHERS CONSTRUCTION LLC in 260 COLLINS AVENUE, MIAMI, FL 33139 (NAICS 236220). OSHA activity number 339088007.
Where did this inspection happen?
- Establishment
- DELGADO BROTHERS CONSTRUCTION LLC
- Site address
- 260 COLLINS AVENUE
- City
- MIAMI
- State
- FL
- ZIP
- 33139
- Mailing
- 1920 NE 8TH AVENUE APARTMENT #1D, MIAMI SHORES, FL 33138
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236220
- Employees
- 49
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.451 B01
- Issued
- Penalty
- Initial $3500.00 · Current $2450.00 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a. On or about May 16, 2013, at the above addressed jobsite, an employee was working on/from a scaffold, to remove stucco from the side of a building, on which each platform was not fully planked.
Recent events (2)
- — I (S) $2450
- — Z (S) $3500
1926.451 G01 VII
- Issued
- Penalty
- Initial $3500.00 · Current $2450.00 Reduced
General-duty citation text
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section: a. On or about May 16, 2013, at the above addressed jobsite, an employee was working on/from the second tier/platform of a scaffold, to remove stucco from the side of a building, for which the platform was not equipped with a guardrail system.
Recent events (2)
- — I (S) $2450
- — Z (S) $3500
1926.452 C02
- Issued
- Penalty
- Initial $3500.00 · Current $2450.00 Reduced
General-duty citation text
29 CFR 1926.452(c)(2): Tubular welded frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would have secured vertical members together laterally: a. On or about May 16, 2013, at the above addressed jobsite, an employee was working on/from a scaffold, to remove stucco from the side of a building, on which platform frames were missing sections of cross bracing.
Recent events (2)
- — I (S) $2450
- — Z (S) $3500
1926.1052 C01 II
- Issued
- Penalty
- Initial $2800.00 · Current $1960.00 Reduced
General-duty citation text
29 CFR 1926.1052(c)(1)(ii): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with a stairrail system along each unprotected side or edge: a. On or about May 16, 2013, at the above addressed jobsite, four employees were using a stairwell to access the upper(s) floor of a building which was under renovation, and for which the stairway did not have a stair-rail system or hand-rail.
Recent events (2)
- — I (S) $1960
- — Z (S) $2800
1926.20 B01
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.20(b)(1): The employer did not initiate and maintain such programs as may be necessary to comply with this part: a. On or about May 16, 2013, at the above addressed jobsite, six employees were performing construction/renovation type work activities, for which the employer did not develop and implement such programs (safety program & employee safety violation disciplinary policy) as may be necessary to comply with this part, such as but not limited to; scaffold assembly and stair-rail system assembly/installation, therefore exposing the employees to a fall hazard. NOTE: CERTIFICATION OF ABATEMENT IS REQUIRED FOR THIS VIOLATION.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections in this industry (NAICS 236220)
NEWPORT BEACH, CA—2026-07-16
KPRS CONSTRUCTION SERVICES, INC.
CHANDLER, AZ—2026-07-16
SUN STATE BUILDERS
ROCHESTER HILLS, MI—2026-07-16
ICON RESTORATION SERVICES
WAUSAU, WI—2026-07-16
MIRON CONSTRUCTION CO. INC.
PONCE, PR—2026-07-15
FC CONSTRUCTION LLC
More inspections in FL
MARIANNA, FL—2026-07-16
BRANNON BROTHERS CONSTRUCTION, LLC
LAKELAND, FL—2026-07-16
SOUTHERN MILLING & LUMBER, INC.
OAKLAND PARK, FL—2026-07-16
PKB CABINETRY
LAKELAND, FL—2026-07-16
ELIJAH WHOLESALE, LLC.
TAMPA, FL—2026-07-16
VALENCIA WHOLESALE, INC.
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339088007.