OSHA Inspection: V & H COMMERCIAL CONCRETE

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of V & H COMMERCIAL CONCRETE in 616 M ST., NE, WASHINGTON, DC 20002 (NAICS 238110). OSHA activity number 339097255.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch V & H Commercial Concrete — free Get an email when a new federal OSHA severe-injury report for V & H Commercial Concrete is published. One employer, no account, unsubscribe in one click.
Site address
616 M ST., NE
City
WASHINGTON
State
DC
ZIP
20002
Mailing
3904 BEL PRE RD., SILVER SPRING, MD 20906
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238110
Employees
2
Ownership type
A

4 citations on file for this inspection.

1926.403 B01 I

Serious Gravity 5 1 instance 2 exposed
Issued
Jul 12, 2013
Abate by
Jul 18, 2013
Penalty
Initial $1,600 · Current $1,600
29 CFR 1926.403(b)(1)(i): Safety of equipment was not determined on the basis of suitability of the equipment for an identified purpose as evidenced by listing, labeling, or certification for that identified purpose:   a)  Basement - A plastic surge protector, designed for residential use, was used on a constitution project to provide temporary power to portable power tools, on or about 05/21/2013.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $1600

1926.403 I02 I

Serious Gravity 5 1 instance 2 exposed
Issued
Jul 12, 2013
Abate by
Jul 22, 2013
Penalty
Initial $2,400 · Current $2,400
29 CFR 1926.403(i)(2)(i): Live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by cabinets or other forms of enclosures, nor by any of the means listed in subparagraph (A) through (D) of this paragraph:       a)  Basement - Masons were exposed to a 120 volt electrical shock hazard from a Cutler Hammer service distribution panel which was not provided with a cover that would protect the workers from accidentally coming in contact with 120 volt live parts, on or about 05/21/2013.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $2400

1926.501 B13

Serious Gravity 5 1 instance 2 exposed
Issued
Jul 12, 2013
Penalty
Initial $2,000 · Current $2,000
29 CFR 1926.501(b)(13): Each employee engaged in residential construction activities 6 feet (1.8 m)  or more above lower levels was not protected by guardrail systems, safety net systems, personal fall arrest systems, or an alternative fall protection measure under another provision of paragraph 1926.501 (b), nor did the employer demonstrate that it is infeasible or creates a greater hazard to use these systems and develop and implement a fall protection plan which meets the requirements of paragraph (k) of section 1926.502:   a)  Second Floor - Construction workers were exposed to a 14 foot fall through window openings that were not provided with fall protection, on or about 05/21/2013.
Recent events (1)
  • — Z (S) $2000

1926.1052 C01 I

Serious Gravity 1 1 instance 2 exposed
Issued
Jul 12, 2013
Abate by
Jul 18, 2013
Penalty
Initial $1,200 · Current $1,200
29 CFR 1926.1052(c)(1)(i): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with at least one handrail:    a)  Second Floor - Roofers and masons were exposed to a possible 10 foot fall hazard while traveling up and down a set of stairs that had not been provided with a handrail, on or about 05/21/2013.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $1200

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339097255.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.