SHIPPENSBURG, PA ·
OSHA Inspection: RT GENERAL CONSTRUCTION, LLC
Programmed Related inspection · Safety discipline
At a glance
On , OSHA opened a programmed Related safety inspection of RT GENERAL CONSTRUCTION, LLC in SHIPPENSBURG UNIVERSITY, FRANKLIN SCIENCE BUILDING FRANKLIN DRIVE, SHIPPENSBURG, PA 17257 (NAICS 238160). OSHA activity number 339099046.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- RT GENERAL CONSTRUCTION, LLC
- Site address
- SHIPPENSBURG UNIVERSITY, FRANKLIN SCIENCE BUILDING FRANKLIN DRIVE
- City
- SHIPPENSBURG
- State
- PA
- ZIP
- 17257
- Mailing
- 111 BUCK ROAD UNIT 300, HUNTINGDON VALLEY, PA 19006
What kind of inspection was it?
- Inspection type
- Programmed Related (J)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 7
- Ownership type
- A
Citations
6 citations on file for this inspection.
1926.501 B10
- Issued
- Jun 19, 2013
- Abate by
- Jul 16, 2013
- Penalty
- Initial $2,800 · Current $1,680 Reduced
General-duty citation text
29 CFR 1926.501(b)(10): Each employee engaged in roofing activities on low-slope roofs with unprotected sides and edges 6 feet or more above lower levels, was not protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system: (a) Franklin Science Building south edge of roof - An employee walked to the edge of the roof past the warning line which was lying on the roof deck to put roofing debris, into the box on the forks of a JCB rough terrain forklift. The employee was not wearing personal fall arrest equipment and was exposed to a potential fall of 35 feet to the ground below, on or about June 5, 2013. (b) Franklin Science Building north edge of the roof - Employees walked along the roof near the edge to retrieve roofing material that was stored at the west end of the building's south wing. There was no warning line established in this area and the men did not use personal fall arrest equipment and were exposed to a potential fall in excess of 35 feet to the ground below, on or about June 5, 2013. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- · I (S) $1680
- · Z (S) $2800
1926.502 F01
- Issued
- Jun 19, 2013
- Abate by
- Jul 16, 2013
- Penalty
- Initial $2,800 · Current $1,680 Reduced
General-duty citation text
29 CFR 1926.502(f)(1): Warning lines were not erected around all sides of the roof work area: (a) Franklin Science Building Roof - The employer did not ensure that the warning line was erected around all sides of the work area. Employees performed roofing work and were required to walk to various areas to get materials and supplies, they were exposed to a 35 foot fall hazard from the roof to the ground below, on or about June 5, 2013. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- · I (S) $1680
- · Z (S) $2800
1926.502 F01 I
- Issued
- Jun 19, 2013
- Abate by
- Jul 16, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.502(f)(1)(i): When no mechanical equipment was being used the warning line was not erected at least 6 feet (1.8m) from the roof edge: (a) Franklin Science Building, roof The employer did maintain a warning lines at least 6 feet from the roof edge. Employees performed roofing work activities in areas adjacent to the warning line that was closer than 6 feet to the edge of the roof. Employee were exposed to a potential fall of 35 feet to the ground below, on or about June 5, 2013. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.502 F02 II
- Issued
- Jun 19, 2013
- Abate by
- Jul 16, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.502(f)(2)(ii): The rope, wire, or chain was not rigged or supported in such a way that its lowest point (including sag) was not less than 34 inches (0.9 m) from the walking/working surface and its highest point no more than 39 inches (1.0 m) from the walking/working surface. (a) Franklin Science Building roof - The warning line was lying on the roof in several locations, the employer did not ensure that the warning line was supported in such a way that its lowest point was not less than 34 inches from the walking working surface. Men performed roofing work in the area adjacent to the warning line lying on the roof deck and were exposed to a potential fall of 35 feet to the ground below, on or about June 5, 2013. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.502 F01 III
- Issued
- Jun 19, 2013
- Abate by
- Jul 16, 2013
- Penalty
- Initial $2,800 · Current $1,680 Reduced
General-duty citation text
29 CFR 1926.502(f)(1)(iii): Points of access, material handling areas, storage areas, and/or hoisting areas were not connected to the work area by an access path formed by two warning lines: (a) Franklin Science Building, roof -The employer did not establish a material handling area that was connected to the work area by two parallel warning lines, where the JCB 550 170 rough terrain forklift was positioned at the roof edge. An employee loaded roofing debris into the wooden box on the forks of the JCB forklift. The employee was exposed to a potential fall of 35 feet to the ground below, on or about June 5, 2013. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- · I (S) $1680
- · Z (S) $2800
1926.602 C01 VI
- Issued
- Jun 19, 2013
- Penalty
- Initial $1,200 · Current $720 Reduced
General-duty citation text
29 CFR 1926.602(c)(1)(vi): Industrial truck(s) in use did not meet the applicable requirements of design, construction, stability, inspection, testing, maintenance, and operation, as defined in American National Standards Institute B56.1-1969, Safety Standards for Powered Industrial Trucks. (a) Franklin Science Building South PARKING AREA - The employer positioned the JCB 550 170 rough terrain forklift on the sidewalk with the boom elevated to the roof edge and left the machine unattended. A wooden box was secured to the forks and men on the roof placed construction debris into the wooden box, on or about June 5, 2013. No abatement certification or documentation required.
Recent events (2)
- · I (S) $720
- · Z (S) $1200
More inspections in this industry (NAICS 238160)
More inspections in PA