Safety Incidents OSHA Severe Injury Reports · 2015–2025
4,113,118Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: SCHOMBER ELECTRIC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of SCHOMBER ELECTRIC in 24 LYON ROAD, BURLINGTON, CT 06013 (NAICS 221114). OSHA activity number 339099780.

Watch Schomber Electric — free Get an email when a new federal OSHA severe-injury report for Schomber Electric is published. One employer, no account, unsubscribe in one click.
Establishment
SCHOMBER ELECTRIC
Site address
24 LYON ROAD
City
BURLINGTON
State
CT
ZIP
06013
Mailing
428 LONG MOUNTAIN ROAD, NEW MILFORD, CT 06776
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
221114
Employees
5
Ownership type
A

2 citations on file for this inspection.

1926.501 B01

Serious Gravity 5 1 instance 5 exposed
Issued
Penalty
Initial $2000.00 · Current $2000.00
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems.  On or about 06/05/2013 at the 24 Lyon Road Solar Installation Project, employees were on the roof installing solar panels and were not using any fall protection systems.
Recent events (1)
  • — Z (S) $2000

1926.503 B01

Other-than-serious 1 instance 5 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.503(b)(1): The employer shall verify compliance with paragraph (a) of this section by preparing a written certification record. The written certification record shall contain the name or other identity of the employee trained, the date(s) of the training, and the signature of the person who conducted the training or the signature of the employer. If the employer relies on training conducted by another employer or completed prior to the effective date of this section, the certification record shall indicate the date the employer determined the prior training was adequate rather than the date of actual training.  On or about 06/05/2013 at the 24 Lyon Road Solar Installation Project, the employer did not certify, in writing, that the employees were trained with paragraph (a).
Recent events (1)
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339099780.