ALTOONA, WI ·
OSHA Inspection: C & E WURZER BUILDERS LLC
Fatality or catastrophe inspection · Safety discipline
At a glance
On , OSHA opened a fatality or catastrophe safety inspection of C & E WURZER BUILDERS LLC in 241 WILLSON AVE, ALTOONA, WI 54720 (NAICS 238130). OSHA activity number 339126070.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- C & E WURZER BUILDERS LLC
- Site address
- 241 WILLSON AVE
- City
- ALTOONA
- State
- WI
- ZIP
- 54720
- Mailing
- 1750 HALLIE RD, CHIPPEWA FALLS, WI 54729
What kind of inspection was it?
- Inspection type
- Fatality or catastrophe (M)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- Yes
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 15
- Ownership type
- Private (A)
Citations
10 citations on file for this inspection.
1910.1200 E01
- Issued
- Sep 11, 2013
- Abate by
- Oct 9, 2013
- Penalty
- Initial $1,200 · Current $1,200
General-duty citation text
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: a) Willson Ave. in Altoona, WI; The employer did not provide a written hazard communication program for employees use when using chemicals such as but not limited to; gasoline, diesel fuel, pneumatic tool oil, adhesives, paints, oils and sealants.
Recent events (1)
- · Z (S) $1200
1910.1200 G01
- Issued
- Sep 11, 2013
- Abate by
- Oct 9, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(g)(1): The employer did not have a material safety data sheet for each hazardous chemical in use: a) Willson Ave. in Altoona, WI; The employer did not provide material safety data sheets for employees use when using chemicals such as but not limited to; gasoline, diesel fuel, pneumatic tool oil, adhesives, paints, oils and sealants.
Recent events (1)
- · Z (S) $0
1910.1200 H03
- Issued
- Sep 11, 2013
- Abate by
- Oct 9, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(h)(3): The employee hazard communication training did not include the requirements of 29 CFR 1910.1200(h)(3)(i) through (h)(3)(iv): (Construction Reference: 1926.59) a) Willson Ave. in Altoona, WI; The employer did not provide the elements of hazard communication training for the employees when using chemicals such as but not limited to; gasoline, diesel fuel, pneumatic tool oil, adhesives, paints, oils and sealants.
Recent events (1)
- · Z (S) $0
1926.501 B13
- Issued
- Sep 11, 2013
- Abate by
- Sep 25, 2013
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) Willson Ave. in Altoona, WI; The employees were working from an unguarded edge of a residential construction project approximately 9 feet 10 inches above grade without the use of fall protection.
Recent events (1)
- · Z (S) $7000
1926.502 B01
- Issued
- Sep 11, 2013
- Abate by
- Sep 25, 2013
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.502(b)(1): The top edge height of the top rails, or equivalent guardrail system members, was not 42 inches (1.1 m) plus or minus 3 inches (8 cm) above the walking/working level: a) Willson Ave. in Altoona, WI; When guardrails did get installed on the second story, the top rails did not meet the requirement of 42 inches plus or minus 3 inches as some of the top rails were as high as 60 inches above the walking/working level.
Recent events (1)
- · Z (S) $2800
1926.503 A01
- Issued
- Sep 11, 2013
- Abate by
- Sep 25, 2013
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards: a) Willson Ave. in Altoona, WI; The employer did not provide a fall protection training program to the employees prior to working from heights, in order to assist the employees in fall hazard recognition and avoidance.
Recent events (1)
- · Z (S) $2800
1926.1052 B03
- Issued
- Sep 11, 2013
- Abate by
- Oct 9, 2013
- Penalty
- Initial $1,600 · Current $1,600
General-duty citation text
29 CFR 1926.1052(b)(3): Treads for temporary stairway service were not installed the full width and depth of the stair: a) Willson Ave. in Altoona, WI; The wood that was placed on the stairways as treads only covered seven inches of the ten inch tread opening.
Recent events (1)
- · Z (S) $1600
1926.1052 C01 I
- Issued
- Sep 11, 2013
- Abate by
- Oct 9, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1052(c)(1)(i): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with at least one handrail: a) Willson Ave. in Altoona, WI; Handrails were not provided on at least one side of the inside of the stairwells at the construction project.
Recent events (1)
- · Z (S) $0
1926.150 A01
- Issued
- Sep 11, 2013
- Abate by
- Oct 9, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.150(a)(1): The employer did not develop and maintain a fire protection program to be followed throughout all phases of construction and demolition work, and/or did not provide for the firefighting equipment as specified in this subpart: a) Willson Ave. in Altoona, WI; The employer did not provide a fire protection program to be utilized by the employees throughout the construction phase of the building project.
Recent events (1)
- · Z (O) $0
1926.150 C01 I
- Issued
- Sep 11, 2013
- Abate by
- Oct 9, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.150(c)(1)(i): A fire extinguisher, rated not less than 2A, was not provided for each 3,000 square feet of the protected building area, or major fraction thereof: a) Willson Ave. in Altoona, WI; The employer did not provide fire extinguishers at the wood frame residential construction site.
Recent events (1)
- · Z (O) $0
More inspections at C & E Wurzer Builders LLC
View C & E Wurzer Builders LLC's full OSHA safety record →
More inspections in this industry (NAICS 238130)
More inspections in WI
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339126070.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.