KENILWORTH, IL —
OSHA Inspection: PCE ROOFING, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of PCE ROOFING, INC. in 143 ABINGDON AVE., KENILWORTH, IL 60043 (NAICS 238160). OSHA activity number 339135618.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PCE ROOFING, INC.
- Site address
- 143 ABINGDON AVE.
- City
- KENILWORTH
- State
- IL
- ZIP
- 60043
- Mailing
- 2017 MELROSE AVE., WAUKEGAN, IL 60085
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 5
- Ownership type
- A
Citations
11 citations on file for this inspection.
1926.100 A
- Issued
- Jun 26, 2013
- Abate by
- Jul 2, 2013
- Penalty
- Initial $1,600 · Current $800 Reduced
General-duty citation text
29 CFR 1926.100(a): Employees were not protected by protective helmets while working in areas where there was a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns: a) Employees were exposed to head injury while working without protective helmets in areas below roofing work activities. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $800
- — Z (S) $1600
1926.102 A01
- Issued
- Jun 26, 2013
- Abate by
- Jul 2, 2013
- Penalty
- Initial $1,600 · Current $800 Reduced
General-duty citation text
29 CFR 1926.102(a)(1): Employees shall be provided with eye and face protection equipment when machines or operations present potential eye or face injury from physical, chemical, or radiation agents: a) Employees were exposed to eye injury while operating a saw to cut roof tiles without the eye protection. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $800
- — Z (S) $1600
1926.300 B02
- Issued
- Jun 26, 2013
- Abate by
- Jul 2, 2013
- Penalty
- Initial $1,600 · Current $800 Reduced
General-duty citation text
29 CFR 1926.300(b)(2): Moving part(s) of equipment exposed to contact by employees or which otherwise created a hazard, were not guarded: a) The belt and pulley on a ladder hoist used to hoist materials to the roof deck was not guarded to prevent contact with moving parts. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $800
- — Z (S) $1600
1926.451 E01
- Issued
- Jun 26, 2013
- Abate by
- Jul 2, 2013
- Penalty
- Initial $2,800 · Current $1,400 Reduced
General-duty citation text
29 CFR 1926.451(e)(1): Safe access was not provided to scaffold platforms when the platforms were more than 2 feet (0.6 m) above or below a point of access: a) Employees were not provided with safe access to scaffolding from which they were required to work at an elevation of approximately 21 feet. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $1400
- — Z (S) $2800
1926.451 F07
- Issued
- Jun 26, 2013
- Abate by
- Jul 2, 2013
- Penalty
- Initial $2,000 · Current $1,000 Reduced
General-duty citation text
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person: a) The employer did not ensure scaffolding provided for employee use was erected under the supervision and direction of a competent person qualified in scaffolding erection. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $1000
- — Z (S) $2000
1926.452 K01
- Issued
- Jun 26, 2013
- Abate by
- Jul 2, 2013
- Penalty
- Initial $2,800 · Current $1,400 Reduced
General-duty citation text
29 CFR 1926.452(k)(1): Ladder jack scaffold platforms exceeded a height of 20 feet (6.1 m): a) Employees were exposed to the hazard of falling approximately 21 feet during the performance of work from a ladder jack scaffold that exceeded the 20 foot maximum permissible height for ladder jack scaffolding. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $1400
- — Z (S) $2800
1926.452 K05
- Issued
- Jun 26, 2013
- Abate by
- Jul 2, 2013
- Penalty
- Initial $2,000 · Current $1,000 Reduced
General-duty citation text
29 CFR 1926.452(k)(5): Scaffold platforms were bridged on to another: a) Employees were exposed to the hazard of falling approximately 21 feet where scaffold platforms were bridged together. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $1000
- — Z (S) $2000
1926.501 B13
- Issued
- Jun 26, 2013
- Abate by
- Jul 2, 2013
- Penalty
- Initial $2,800 · Current $1,400 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501(b): a) Employees were exposed to the hazard of falling while working from a pitched roof having a ground to eave height of approximately 22 feet without the use of fall protection. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $1400
- — Z (S) $2800
1926.501 B01
- Issued
- Jun 26, 2013
- Abate by
- Jul 2, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems: a) Employees were exposed to the hazard of falling approximately 25 feet while walking and working from a walking working surface/platform spanned between two dormers on the roof of the building. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 G01 I
- Issued
- Jun 26, 2013
- Abate by
- Jul 2, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(g)(1)(i): Each employee on a boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold was not protected by a personal fall arrest system: a) Employees were exposed to the hazard of falling approximately 21 feet while working from ladder jack scaffolding without the benefit of fall protection. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.503 A01
- Issued
- Jun 26, 2013
- Abate by
- Jul 2, 2013
- Penalty
- Initial $2,000 · Current $1,000 Reduced
General-duty citation text
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards: a) The employer did not provide training to enable employees to recognize the hazards of falling and the procedures to be followed to eliminate or control such hazards at the worksite. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $1000
- — Z (S) $2000
More inspections at PCE Roofing, INC.
View PCE Roofing, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339135618.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.