SAINT JAMES, MO ·
OSHA Inspection: GARGUS SAWMILL
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of GARGUS SAWMILL in 17002 HWY 68 SOUTH, SAINT JAMES, MO 65559 (NAICS 321113). OSHA activity number 339149296.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- GARGUS SAWMILL
- Site address
- 17002 HWY 68 SOUTH
- City
- SAINT JAMES
- State
- MO
- ZIP
- 65559
- Mailing
- 17002 HWY 68 SOUTH, SAINT JAMES, MO 65559
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 321113
- Employees
- 8
- Ownership type
- Private (A)
Citations
3 citations on file for this inspection.
1910.95 G06
- Issued
- Jul 3, 2013
- Abate by
- Sep 11, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.95(g)(6): At least annually after obtaining the baseline audiogram, the employer did not obtain a new audiogram for each employee exposed at or above an 8-hour time-weighted average of 85 decibels: a. Hearing tests had not been provided annually. Abatement documentation is required for this violation.
Recent events (1)
- · Z (O) $0
1910.147 C04 II
- Issued
- Jul 3, 2013
- Abate by
- Sep 11, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, including, but not limited to Items of this section: a. Lockout procedures had not been written for each machine (note: procedures, along with training is required to be documented and kept up to date). Abatement documentation is required for this violation.
Recent events (1)
- · Z (O) $0
1910.305 B01 II
- Issued
- Jul 3, 2013
- Abate by
- Sep 11, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.305(b)(1)(ii): Unused openings in boxes, cabinets, or fittings were not effectively closed: a. At the edger area, two electrical boxes had openings into the boxes that were not effectively closed (note: ensure that cables entering the boxes are secured to prevent strain on connections inside the box). Abatement documentation is required for this violation.
Recent events (1)
- · Z (O) $0
More inspections at Gargus Sawmill
View Gargus Sawmill's full OSHA safety record →
More inspections in this industry (NAICS 321113)
More inspections in MO
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339149296.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.