Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,196,249Inspections Most recent open 2026-08-20 Last loaded 2026-08-24

OSHA Inspection: REDDING - ROGERS PREFFERED SERVICES

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of REDDING - ROGERS PREFFERED SERVICES in 4912 KING PLACE NW, WASHINGTON, DC 20007 (NAICS 238140). OSHA activity number 339149981.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Redding - Rogers Preffered Services for free Get an email when a new federal OSHA severe-injury report for Redding - Rogers Preffered Services is published. One employer, no account, unsubscribe in one click.
Site address
4912 KING PLACE NW
City
WASHINGTON
State
DC
ZIP
20007
Mailing
4655 CASANOVA RD, WARRENTON, VA 20187
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
3
Ownership type
Private (A)

4 citations on file for this inspection.

1926.100 A

Serious Gravity 5 1 instance 1 exposed
Issued
Aug 5, 2013
Abate by
Aug 9, 2013
Penalty
Initial $2,000 · Current $1,000 Reduced
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets:     a) Front Right Side, Facing House - An employee was not protected from falling objects when he  loaded materials into a 5 gallon bucket and hoisted it to an employee working above on a scaffold, on or about 6/25/2013.     Abatement Certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $1000
  • · Z (S) $2000

1926.451 H02 II

Serious Gravity 5 1 instance 1 exposed
Issued
Aug 5, 2013
Abate by
Aug 9, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.451(h)(2)(ii): A toeboard was not erected along the edge of platforms more than 10 feet (3.1 m) above lower levels for a distance sufficient to protect employees below:    a) Front Right Side, Facing House-  Employee on ground below an employee working from a scaffold 20 feet high was not protected from falling objects when materials were hoisted to the employee above on or about 06/25/2013.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.451 B01

Serious Gravity 5 1 instance 2 exposed
Issued
Aug 5, 2013
Abate by
Aug 9, 2013
Penalty
Initial $2,000 · Current $1,000 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii)        a) Front Right Side, Facing Structure - Two employees working from  scaffold platforms approximately 20' high with only one or two planks performing and assisting in brick pointing operations on a chimney, on or about 6/25/2013     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $1000
  • · Z (S) $2000

1926.451 G01 VII

Serious Gravity 5 1 instance 1 exposed
Issued
Aug 5, 2013
Abate by
Aug 9, 2013
Penalty
Initial $2,000 · Current $1,000 Reduced
29 CFR 1926.451(g)(1)(vii): For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee was not protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.    a) Front Right Side, Facing House -  An employee working from a tubular welded frame scaffold performing/assisting brick pointing operations was not protected from falling 20' to the concrete and ground below, on or about 06/25/2013.           Abatement Certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $1000
  • · Z (S) $2000

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339149981.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.