Safety Incidents OSHA Severe Injury Reports · 2015–2025
2,004,209Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: PAINT, CLEANING & RENOVATION SERVICES, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PAINT, CLEANING & RENOVATION SERVICES, INC. in 1400 SPRING STREET, NW, WASHINGTON, DC 20009 (NAICS 236220). OSHA activity number 339155533.

Watch Paint, Cleaning & Renovation Services, INC. — free Get an email when a new federal OSHA severe-injury report for Paint, Cleaning & Renovation Services, INC. is published. One employer, no account, unsubscribe in one click.
Site address
1400 SPRING STREET, NW
City
WASHINGTON
State
DC
ZIP
20009
Mailing
79 TUCKERMAN STREET, NE, WASHINGTON, DC 20011
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
7
Ownership type
A

7 citations on file for this inspection.

1926.102 A01

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $1200.00 · Current $1200.00
29 CFR 1926.102(a)(1): Eye and face protective equipment were not used when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents:   a) Roof of the Building - A carpenter was observed without eye protection cutting 2 by 4 boards which was not exposing him to a potential eye injury hazard, on or about 06/27/13.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $1200

1926.403 B02

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $1200.00 · Current $1200.00
29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification:   a) Roof of the Building - A carpenter was observed using a 120 v electrical receptacle which was not installed in accordance with the manufactures or underwriters laboratories (UL) specifications exposing him to an electrical hazard, on or about 06/27/13.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $1200

1926.403 D01

Serious 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.403(d)(1): Mounting. Electric equipment shall be firmly secured to the surface on which it is mounted:   a) Roof of the Building - A carpenter was observed using a 120 v electrical receptacle which was not securely mounted to a solid surface exposing him to an electrical hazard, on or about 06/27/13.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.404 B01 II

Serious Gravity 1 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $1200.00 · Current $1200.00
29 CFR 1926.404(b)(1)(ii): On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupters (GFCI)for personal protection:   a) Roof of the Building - A carpenter was observed using a 120 v electrical receptacle cutting 2 by 4 boards which was not protected with GFCI exposing him to an electrical hazard , on or about 06/27/13.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $1200

1926.501 B01

Serious Gravity 5 1 instance 6 exposed
Issued
Abate by
Penalty
Initial $1600.00 · Current $1600.00
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems:   a) Roof of the Building - A superintendent and carpenters were observed without fall protection while working near an unguarded stairway opening exposing him to a 10 foot fall hazard.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $1600

1926.501 B10

Serious Gravity 5 2 instances 6 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $2000.00
29 CFR 1926.501(b)(10): Each employee engaged in roofing activities on low-slope roofs with unprotected sides and edges 6 feet or more above lower levels, was not protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system.  Or, on roofs 50-feet (15.25 m) or less in width, each employee was not protected by use of a monitoring system:   a) North & West Sides of the Roof - A superintendent and carpenters were observed without fall protection while on a roof exposed to a 27 foot fall hazard, on or about 06/27/13.   b) South & East Sides of the Roof - A superintendent and carpenters were observed without fall protection while on a roof exposed to a 16 foot fall hazard, on or about 06/27/13.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $2000

1926.852 E

Serious Gravity 5 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $2000.00 · Current $2000.00
29 CFR 1926.852(e): Chute openings, into which workmen dumped debris, were not protected by substantial guardrails approximately forty-two inches above the floor or other surface on which men stood to dump material:   a) North Side of the Roof - Carpenters were observed using a job made chute which was not equipped with standard guardrails around it exposing them to a 27 foot fall hazard, on or about 06/27/13.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $2000

MACY'S

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339155533.