OSHA Inspection: TAMARACK ENERGY PARTNERSHIP

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of TAMARACK ENERGY PARTNERSHIP in 3555 HWY 95 S, NEW MEADOWS, ID 83654 (NAICS 562213). OSHA activity number 339157059.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Tamarack Energy Partnership for free Get an email when a new federal OSHA severe-injury report for Tamarack Energy Partnership is published. One employer, no account, unsubscribe in one click.
Site address
3555 HWY 95 S
City
NEW MEADOWS
State
ID
ZIP
83654
Mailing
P.O. BOX H, NEW MEADOWS, ID 83654
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
562213
Employees
9
Ownership type
Private (A)

7 citations on file for this inspection.

5(a)(1)

Serious Gravity 1 1 instance 7 exposed
Issued
Sep 27, 2013
Abate by
Oct 24, 2013
Penalty
Initial $1,020 · Current $510 Reduced
OSH ACT of 1970 Section (5)(a)(1): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees:     a) In the boiler building: On June 24, 2013, and at times prior thereto, steam lines located in the walking /working areas were un-insulated, un-marked, and un-guarded exposing employees to possible burn hazards.     Note: Abatement certification IS required for this item.
Recent events (2)
  • · I (S) $510
  • · Z (S) $1020

1910.22 D02

Serious Gravity 5 1 instance 7 exposed
Issued
Sep 27, 2013
Abate by
Oct 24, 2013
Penalty
Initial $1,360 · Current $680 Reduced
29 CFR 1910.22(d)(2):  A load greater than that approved by the building official was permitted on the roof of a building or other structure:        a) Feed Bins:  On or about June 24, 2013, and at times prior thereto, the roof of the feed bins was not maintained and had rusted.  Saw dust was allowed to accumulate in large volumes on the failing roof, thereby exposing employees to potential struck-by hazard.         Note: Abatement certification is required for this item.
Recent events (2)
  • · I (S) $680
  • · Z (S) $1360

1910.23 E01

Serious Gravity 5 2 instances 7 exposed
Issued
Sep 27, 2013
Abate by
Oct 24, 2013
Penalty
Initial $1,700 · Current $850 Reduced
29 CFR 1910.23(e)(1): A standard railing did not consist of top rail, intermediate rail, and posts, and have a vertical height of 42 inches nominal from upper surface of top rail to floor, platform, runway, or ramp level:     a) On the exterior heat exchanger cat walk on the boiler building: On June 24, 2013, and at times prior thereto, the cat walk was missing the mid rail and one end rail between the new and the added walkway.        b) In the boiler building under the flyash venturi: On June 24, 2013, and at times prior thereto, the work platform (16 inch wide concrete ledge)  where the fly ash venturi was cleaned did not have a complete guard rail to prevent employees from falling 50 inches to the concrete floor.     Note: Abatement certification IS required for this item.
Recent events (2)
  • · I (S) $850
  • · Z (S) $1700

1910.269 B

Serious Gravity 5 2 instances 7 exposed
Issued
Sep 27, 2013
Abate by
Oct 24, 2013
Penalty
Initial $1,700 · Current $850 Reduced
29 CFR 1910.269(b): The employer did not provide medical services and first aid as required in 1910.151 of this Part:   a)  In the power plant: On June 24, 2013, and at times prior thereto, there was no first aid trained person on the employers staff trained in basic first aid to cover all shifts.  b) In the power plant: On june 24, 2013, and at times prior thereto, there was no breathing barrier in the first aid kit.   Note: Abatement certification IS required for this item.
Recent events (2)
  • · I (S) $850
  • · Z (S) $1700

1910.269 E04

Serious Gravity 5 1 instance 7 exposed
Issued
Sep 27, 2013
Abate by
Oct 24, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.269(e)(4): Before any entrance cover to an enclosed space is removed, the employer did not determine whether it was safe to do so by checking for the presence of any atmospheric pressure or temperature differences and by evaluating whether there might be a hazardous atmosphere in the space. Any conditions making it unsafe to remove the cover were not eliminated before the cover is removed.       a) At Pit 3 north of the boiler building: On June 24, 2013, and at times prior thereto, employees were instructed to check the pump oilers inside the Pit 3 building twice daily without checking for hazards such as steam, fog, or lack of oxygen.   Note: Abatement certification is required for this item.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1910.215 B09

Repeat Gravity 1 1 instance 1 exposed
Issued
Sep 27, 2013
Abate by
Oct 9, 2013
Penalty
Initial $2,400 · Current $1,800 Reduced
29 CFR 1910.215(b)(9): The distance between the abrasive wheel periphery(s) and the adjustable tongue or the end of the safety guard peripheral member at the top exceeded one fourth inch:    a) On the bench grinder in the Boiler building: On June 24, 2013 and at times prior thereto, the tongue guard on the Milwaukee bench grinder in the maintenance area  was missing.    Note: Abatement certification and documentation ARE required for this item.   Tamarack Mills, LLC dBA Evergreen Forest was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29 CFR 1910.215(b)(9), which was contained in OSHA inspection number 311578769 citation number 01, item number 001 and was affirmed as a final order on January 22, 2009, with respect to a workplace located at 3555 Hwy 95, New Meadows, ID 83654.
Recent events (2)
  • · I (R) $1800
  • · Z (R) $2400

1910.242 B

Other-than-serious 1 instance 7 exposed
Issued
Sep 27, 2013
Abate by
Oct 24, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.242(b): Compressed air was used for cleaning at pressures greater than 30 p.s.i. without with effective chip guarding and personal protective equipment:    a) In the boiler building: On June 24, 2013, and at times prior thereto, employees were using 80 p.s.i. of air line pressure without safety tips or dead man valves.    NOte: Abatement certification is required for this item.
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339157059.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.