Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: POOLE ANDERSON CONSTRUCTION, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of POOLE ANDERSON CONSTRUCTION, LLC in 524 NORTH HOMEWOOD AVENUE, PITTSBURGH, PA 15208 (NAICS 238290). OSHA activity number 339162091.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Poole Anderson Construction, LLC — free Get an email when a new federal OSHA severe-injury report for Poole Anderson Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
524 NORTH HOMEWOOD AVENUE
City
PITTSBURGH
State
PA
ZIP
15208
Mailing
2121 OLD GATESBURG ROAD SUITE 100, STATE COLLEGE, PA 16803
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238290
Employees
77
Ownership type
A

7 citations on file for this inspection.

1926.651 C02

Other-than-serious 1 instance 2 exposed
Issued
Sep 20, 2013
Penalty
Initial $3,000 · Current $3,000
29 CFR 1926.651(c)(2): A stairway, ladder, ramp or other safe means of egress was not located in trench excavations that are 4 feet (1.22 m) or more in depth so as to require no more than 25 feet (7.62 m) of lateral travel for employees:      a) Job site, 524 North Homewood Avenue, Pittsburgh, PA: On or about June 24, 2013, the employer did not ensure that a safe means of egress was provided in an excavation located on the east end of the job site determined to be at approximately four feet and ten inches in depth. The employer used a portable step ladder to get in and out of the excavation, but it was not appropriately extended above the top of the excavation to allow employees something to hold onto when getting in/out of the excavation.     b) Job site, 524 Homewood Avenue, Pittsburgh, PA: On or about June 24, 2013, the employer did not ensure that a safe means of egress was provided in an excavation located on the east side of the job site determined to be at approximately four feet and eight inches in depth. An employee was working between the rebar cage assembly and the excavation wall, with no ladder, stairs or other safe means of getting in/out of the excavation if needed.
Recent events (2)
  • — I (O) $3000
  • — Z (S) $3000

1926.1053 B04

Other-than-serious 1 instance 2 exposed
Issued
Sep 20, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.1053(b)(4): Ladders were used for purposes other than that for which they were designed:    a) Job site, 524 North Homewood Avenue, Pittsburgh, PA: On or about June 24, 2013, in an excavation on the east side of the job site, the employer did not ensure that a portable step ladder was used appropriately in that it was folded up and laid against the side of an excavation wall for employees to use when getting in/out of the excavation.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1926.652 A01

Serious Gravity 5 1 instance 2 exposed
Issued
Sep 20, 2013
Penalty
Initial $5,000 · Current $5,000
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with paragraph (b) or (c) of this section:  a) Job site, 524 North Homewood Avenue, Pittsburgh, PA: On or about June 10, 2013, the employer did not ensure that appropriate cave in protection was provided along an excavation wall on the east end of the existing building facade while employees performed activities such as layout work. The excavation walls were determined to be approximately 11 feet deep and the angle of the wall was determined to range between approximately 60-90 degrees and no shoring, sheilding or other actions were taken to protect workers in the event of the excavation wall collapsing.   b) Job site, 524 North Homewood Avenue, Pittsburgh, PA: On or about June 10, 2013, the employer did not ensure that appropriate cave in protection was provided along an excavation wall on the west end of the existing building facade during general construction work activities. Wood lagging was used along most of the excavation wall, but was missing in a gap which was determined to be approximatley 3 feet wide and the excavation wall behind it was determined to be approximately 10 feet in height with an approximate slope of 70-80 degrees, exposing employees to excavation wall collapse hazards.
Recent events (2)
  • — I (S) $5000
  • — Z (S) $5000

1926.651 J01

Other-than-serious 1 instance 2 exposed
Issued
Sep 20, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.651(j)(1): Adequate protection was not provided to protect employees from loose rock or soil that could pose a hazard by falling or rolling from an excavation face such as scaling to remove loose material, installation of protective barricades at intervals as necessary on the face to stop and contain falling material or other means that provide equivalent protection:    a) Job site, 524 North Homewood Avenue, Pittsburgh, PA: On or about June 10, 2013, on the east side of the existing building facade, the employer did not ensure that protection was provided to prevent materials from falling or rolling into the excavation in that loose rock/bricks were not removed or restrained near the top potions of the excavation wall.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1926.651 I01

Other-than-serious 1 instance 1 exposed
Issued
Sep 20, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.651(i)(1): Where the stability of adjoining buildings, walls, or other structures was endangered by excavation operations, support systems such as shoring, bracing, or underpinning shall be provided to ensure the stability of such structures for the protection of employees:    a) Job site, 524 North Homewood Avenue, Pittsburgh, PA: On or about June 10, 2013, at the west end of the building facade, the employer did not ensure that appropriate protection was provided to prevent the soils from under the sidewalk of the existing building facade from collapsing.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1926.152 E04

Other-than-serious 1 instance 1 exposed
Issued
Sep 20, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.152(e)(4): Dispensing units were not protected against collision damage:  a) Job site, 524 North Homewood Avenue, Pittsburgh, PA: On or about September 3, 2013, the employer did not ensure that the deisel tank dispensing unit was protected against damage. An operator was using a forklift nearby this area to unload long steel bars, which could have slid off and struck the tank/nozzle.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1926.651 D

Other-than-serious 1 instance 5 exposed
Issued
Sep 20, 2013
Abate by
Sep 26, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.651(d): Employees who were exposed to public vehicular traffic were not provided with, and did not wear, warning vests or other suitable garments marked with or made of reflectorized or high-visibility material:   a) Job site, 524 North Homewood Avenue, Pittsburgh, PA: On or about June 25, 2013, the employer did not ensure that safety vests, or equivalent products, were provided and worn when walking along the roadway on the south side of the excavation, where public vehicles operated.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View Poole Anderson Construction, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339162091.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.