SAINT LOUIS, MO —
OSHA Inspection: HEINTZ STEEL AND MANUFACTURING COMPANY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of HEINTZ STEEL AND MANUFACTURING COMPANY in 3300 HALL ST., SAINT LOUIS, MO 63147 (NAICS 332312). OSHA activity number 339179632.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- HEINTZ STEEL AND MANUFACTURING COMPANY
- Site address
- 3300 HALL ST.
- City
- SAINT LOUIS
- State
- MO
- ZIP
- 63147
- Mailing
- 3300 HALL ST., SAINT LOUIS, MO 63147
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332312
- Employees
- 16
- Ownership type
- A
Citations
2 citations on file for this inspection.
1910.147 C04 II
- Issued
- Jul 18, 2013
- Abate by
- Sep 4, 2013
- Penalty
- Initial $900 · Current $630 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): a. Lockout procedures did not include the specificity as required by 1910.147(c)(4)(ii)(A) through (D), including specific energy sources, specific shut down method, specific lockout energy isolation device and location, specific method to test to ensure machine or equipment is de-energized. Abatement documentation is required for this violation.
Recent events (2)
- — I (S) $630
- — Z (S) $900
1910.147 C06 I
- Issued
- Jul 18, 2013
- Abate by
- Sep 4, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a. The lockout inspection was not conducted annually; the last documented inspection was 4-6-10. Abatement documentation is required for this violation.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at Heintz Steel and Manufacturing Company
View Heintz Steel and Manufacturing Company's full OSHA safety record →
More inspections in this industry (NAICS 332312)
More inspections in MO
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339179632.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.