OSHA Inspection: CORINTHIAN CONTRACTORS

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of CORINTHIAN CONTRACTORS in 1605 30TH. ST., NW, WASHINGTON, DC 20007 (NAICS 237110). OSHA activity number 339208621.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Corinthian Contractors — free Get an email when a new federal OSHA severe-injury report for Corinthian Contractors is published. One employer, no account, unsubscribe in one click.
Site address
1605 30TH. ST., NW
City
WASHINGTON
State
DC
ZIP
20007
Mailing
3126 S. ABINGTON ST., ARLINGTON, VA 22206
Inspection type
Referral (C)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237110
Employees
5
Ownership type
A

5 citations on file for this inspection.

1926.651 K02

Other-than-serious 1 instance 2 exposed
Issued
Nov 13, 2013
Abate by
Dec 3, 2013
Penalty
Initial $4,900 · Current $4,900
29 CFR 1926.651(k)(2): Where the competent person found evidence of a situation that could result in possible cave-in, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions, exposed employees were not removed from the hazardous area until the necessary precautions have been taken to ensure their safety:        a)  Main Entrance to House - On or about 07/10/2013, the site competent person did not remove two utility workers from a 8 ft. deep excavation, comprised of Class B soil and having vertical walls, that had no protection against an accidental cave-in.      Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (O) $4900
  • — Z (S) $4900

1926.652 A01

Other-than-serious 1 instance 2 exposed
Issued
Nov 13, 2013
Abate by
Dec 3, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652(c). The employer had not complied with the provisions of 29 CFR 1926.652(b)(1)(i) in that:     a)  Main Entrance to House - On or about 07/10/2013, utility workers working in an 8 foot wide by 10 foot long by 8 foot deep excavation, were not provided with protection to prevent accidental cave-ins. The excavation was provided with only one hydraulic shore that was extended 8.5 feet between two shoring sheets a configuration which is not in conformance with Table D-1.3.     Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1926.652 C02 III

Other-than-serious 1 instance 2 exposed
Issued
Nov 13, 2013
Abate by
Dec 3, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.652(c)(2)(iii): Manufacturer's approval to deviate from the specifications, recommendations, and limitations were not in written form at the job site during construction of the protective systems:      a)  Main Entrance to House - On or about 07/10/2013, the contractor had no tabulated data available on the job site for hydraulic shoring that was being used in an excavation which was actively being excavated.     Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1926.652 D01

Other-than-serious 1 instance 3 exposed
Issued
Nov 13, 2013
Abate by
Dec 3, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.652(d)(1): Materials and equipment used for protective systems were not free from damage or defects that might impair their proper function:     a)  Front Entrance to House - On or about 07/10/2013, the employer used a hydraulic shoring system with damaged components including, but not limited to, bent shoring members and broken gages on a hydraulic shoring pump.     Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1926.652 E02 I

Other-than-serious 1 instance 3 exposed
Issued
Nov 13, 2013
Abate by
Dec 3, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.652(e)(2)(i): Excavation of material to a level no greater than 2 feet (.61m) below the bottom of the members of a support system was permitted where the system was not designed to resist the forces calculated for the full depth of the trench:       a)  Main Entrance to House -  On or about 07/10/2013, workers were exposed to a cave-in hazard attributed to scaffold boards that were used in conjunction with a hydraulic shoring system whose bottom edges were located three feet above the bottom of the excavation.     Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

View Corinthian Contractors's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339208621.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.