WASHINGTON, DC —
OSHA Inspection: CORINTHIAN CONTRACTORS
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of CORINTHIAN CONTRACTORS in 1605 30TH. ST., NW, WASHINGTON, DC 20007 (NAICS 237110). OSHA activity number 339208621.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CORINTHIAN CONTRACTORS
- Site address
- 1605 30TH. ST., NW
- City
- WASHINGTON
- State
- DC
- ZIP
- 20007
- Mailing
- 3126 S. ABINGTON ST., ARLINGTON, VA 22206
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 237110
- Employees
- 5
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.651 K02
- Issued
- Nov 13, 2013
- Abate by
- Dec 3, 2013
- Penalty
- Initial $4,900 · Current $4,900
General-duty citation text
29 CFR 1926.651(k)(2): Where the competent person found evidence of a situation that could result in possible cave-in, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions, exposed employees were not removed from the hazardous area until the necessary precautions have been taken to ensure their safety: a) Main Entrance to House - On or about 07/10/2013, the site competent person did not remove two utility workers from a 8 ft. deep excavation, comprised of Class B soil and having vertical walls, that had no protection against an accidental cave-in. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (O) $4900
- — Z (S) $4900
1926.652 A01
- Issued
- Nov 13, 2013
- Abate by
- Dec 3, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652(c). The employer had not complied with the provisions of 29 CFR 1926.652(b)(1)(i) in that: a) Main Entrance to House - On or about 07/10/2013, utility workers working in an 8 foot wide by 10 foot long by 8 foot deep excavation, were not provided with protection to prevent accidental cave-ins. The excavation was provided with only one hydraulic shore that was extended 8.5 feet between two shoring sheets a configuration which is not in conformance with Table D-1.3. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (O) $0
- — Z (S) $0
1926.652 C02 III
- Issued
- Nov 13, 2013
- Abate by
- Dec 3, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.652(c)(2)(iii): Manufacturer's approval to deviate from the specifications, recommendations, and limitations were not in written form at the job site during construction of the protective systems: a) Main Entrance to House - On or about 07/10/2013, the contractor had no tabulated data available on the job site for hydraulic shoring that was being used in an excavation which was actively being excavated. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (O) $0
- — Z (S) $0
1926.652 D01
- Issued
- Nov 13, 2013
- Abate by
- Dec 3, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.652(d)(1): Materials and equipment used for protective systems were not free from damage or defects that might impair their proper function: a) Front Entrance to House - On or about 07/10/2013, the employer used a hydraulic shoring system with damaged components including, but not limited to, bent shoring members and broken gages on a hydraulic shoring pump. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (O) $0
- — Z (S) $0
1926.652 E02 I
- Issued
- Nov 13, 2013
- Abate by
- Dec 3, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.652(e)(2)(i): Excavation of material to a level no greater than 2 feet (.61m) below the bottom of the members of a support system was permitted where the system was not designed to resist the forces calculated for the full depth of the trench: a) Main Entrance to House - On or about 07/10/2013, workers were exposed to a cave-in hazard attributed to scaffold boards that were used in conjunction with a hydraulic shoring system whose bottom edges were located three feet above the bottom of the excavation. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (O) $0
- — Z (S) $0
More inspections at Corinthian Contractors
View Corinthian Contractors's full OSHA safety record →
More inspections in this industry (NAICS 237110)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339208621.