OSHA Inspection: PEREIRA CONSTRUCTION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PEREIRA CONSTRUCTION in 5500 SHERIER OLNW, WASHINGTON, DC 20015 (NAICS 238140). OSHA activity number 339213043.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Pereira Construction — free Get an email when a new federal OSHA severe-injury report for Pereira Construction is published. One employer, no account, unsubscribe in one click.
Site address
5500 SHERIER OLNW
City
WASHINGTON
State
DC
ZIP
20015
Mailing
2301 NORBECK RD, SILVER SPRING, MD 20906
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
15
Ownership type
A

5 citations on file for this inspection.

1926.100 A

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 9, 2013
Abate by
Oct 3, 2013
Penalty
Initial $1,800 · Current $900 Reduced
29 CFR 1926.100(a): Employees were not protected by protective helmets while working in areas where there was a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns:       a) On June 24, 2013 and at times prior thereto; side of residential home; employees were observed working near and/or under the scaffold system or roof area without any head protection that would protect them from falling debris, materials or tools used in the process.      Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $900
  • — Z (S) $1800

1926.451 B01

Serious Gravity 10 1 instance 1 exposed
Issued
Sep 9, 2013
Abate by
Oct 3, 2013
Penalty
Initial $2,520 · Current $2,100 Reduced
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units, and the space between the platform and the uprights is no     a) On June 24, 2013 and at times prior thereto; side of building, employees were observed on the working platform of a scaffold system that was not fully planked, missing two planks; the height from the work platform to ground level was 30 feet.     Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $2100
  • — Z (S) $2520

1926.451 E01

Serious Gravity 10 1 instance 2 exposed
Issued
Sep 9, 2013
Abate by
Oct 3, 2013
Penalty
Initial $2,520 · Current $0 Reduced
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.  Cross-braces were used as a means of access.      a) On June 24, 2013 and at times prior thereto; side of building, employees were exposed to a fall of approximately 30 feet when accessing the scaffold system by climbing the frame.     Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $2520

1926.451 G01 VI

Serious Gravity 10 1 instance 2 exposed
Issued
Sep 9, 2013
Abate by
Oct 3, 2013
Penalty
Initial $2,520 · Current $0 Reduced
29 CFR 1926.451(g)(1)(vi): Each employee performing overhand bricklaying operations from a supported scaffold was not protected from falling from all open sides and ends of the scaffold (except at the side next to the wall being laid) by the use of a personal fall arrest system or guardrail system (with minimum 200 pound top-rail capacity).     a) On June 24, 2013 and at times prior thereto; side of building; employees working on a scaffold system conducting masonry work on the chimney were exposed to a 30 foot fall at the ends and along the front of the working platform.     Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $2520

1926.451 G04 IV

Serious Gravity 10 3 instances 1 exposed
Issued
Sep 9, 2013
Abate by
Oct 3, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(4)(iv): Mid-rails were not installed at a height approximately midway between the top edge of the guardrail system and the platform surface:      a) On June 24, 2013 and at times prior thereto; side of the building, employees were working on a scaffold system that did not have mid-rails to prevent employees from falling 30 feet to ground level.     Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Pereira Construction's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339213043.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.