At a glance
On , OSHA opened a complaint safety inspection of ENGINEERED PLASTIC COMPONENTS, INC. in 300 SHELLHOUSE DRIVE, RANTOUL, IL 61866 (NAICS 326199). OSHA activity number 339221186.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ENGINEERED PLASTIC COMPONENTS, INC.
- Site address
- 300 SHELLHOUSE DRIVE
- City
- RANTOUL
- State
- IL
- ZIP
- 61866
- Mailing
- 300 SHELLHOUSE DRIVE, RANTOUL, IL 61866
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 326199
- Employees
- 150
- Ownership type
- Private (A)
Citations
4 citations on file for this inspection.
1910.22 A02
- Issued
- Aug 27, 2013
- Abate by
- Sep 3, 2013
- Penalty
- Initial $3,960 · Current $3,000 Reduced
General-duty citation text
29 CFR 1910.22(a)(2): The floor of every workroom shall be maintained in a clean and, so far as possible, a dry condition. Where wet processes are used, drainage shall be maintained, and false floors, platforms, mats, or other dry standing places should be provided where practicable. Engineered Plastic Components, Inc. had employees exposed to fall hazards from the accumulation of oil around equipment throughout the facility.
Recent events (2)
- · I (S) $3000
- · Z (S) $3960
1910.147 C04 II B
- Issued
- Aug 27, 2013
- Abate by
- Sep 9, 2013
- Penalty
- Initial $4,950 · Current $4,950
General-duty citation text
29 CFR 1910.147(c)(4)(ii)(B): Specific procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy; Engineered Plastic Components, Inc. had employees perform maintenance operations on equipment within the facility, and the employers machine specific lockout procedure did not list specific procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. These specific lockout procedures include but are not limited to the following: Press 122, Robot for Press 122, Press 127, and Robot for Press 127.
Recent events (2)
- · I (S) $4950
- · Z (S) $4950
1910.147 C04 II D
- Issued
- Aug 27, 2013
- Abate by
- Sep 9, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(4)(ii)(D): Specific requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control measures. Engineered Plastic Components, Inc. had employees perform maintenance operations on equipment within the facility, and the employers machine specific lockout procedure did not list specific requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control measures. These specific lockout procedures include but are not limited to the following: Press 122, Robot for Press 122, Press 127, and Robot for Press 127.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1910.147 C06 I
- Issued
- Aug 27, 2013
- Abate by
- Sep 9, 2013
- Penalty
- Initial $4,950 · Current $0 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. Engineered Plastic Components, Inc. had employees perform maintenance operations on equipment within the facility, and the employer did not conduct a periodic inspection of energy control procedures at least annually to ensure that the procedure and the requirements of 1910.147 were being followed. This periodic inspection would include the following: The periodic inspection shall be performed by an authorized employee other than the one(s) utilizing the energy control procedure being inspected, The periodic inspection shall be conducted to correct any deviations or inadequacies identified, Where lockout is used for energy control, the periodic inspection shall include a review, between the inspector and each authorized employee, of that employees responsibilities under the energy control procedure being inspected, Where tagout is used for energy control, the periodic inspection shall include a review, between the inspector and each authorized and affected employee, of that employees responsibilities under the energy control procedure being inspected.
Recent events (2)
- · I (S) $0
- · Z (S) $4950
More inspections at Engineered Plastic Components, INC.
View Engineered Plastic Components, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 326199)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339221186.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.