Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: RITTER & PARATORE CONTRACTING, INC.

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of RITTER & PARATORE CONTRACTING, INC. in 350 FOREST AVE, AMSTERDAM, NY 12010 (NAICS 238910). OSHA activity number 339225310.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Ritter & Paratore Contracting, INC. — free Get an email when a new federal OSHA severe-injury report for Ritter & Paratore Contracting, INC. is published. One employer, no account, unsubscribe in one click.
Site address
350 FOREST AVE
City
AMSTERDAM
State
NY
ZIP
12010
Mailing
2435 STATE RT 5, UTICA, NY 13502
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238910
Employees
23
Ownership type
A

3 citations on file for this inspection.

1910.134 D03 III B 2

Deleted Serious Gravity 5 1 instance 1 exposed
Issued
Nov 4, 2013
Abate by
Nov 22, 2013
Penalty
Initial $2,000 · Current $0 Reduced
29 CFR 1910.134(d)(3)(iii)(B)(2): The employer did not implement a change schedule for respirators not equipped with an End of Service Life Indicator ESLI that would ensure cartridges were changed before the end of their service life:    (a) On or about 07/24/2013, at jobsite , for the heavy equipment operator wearing survivair half-face respirator with P100 cartridges during demolition job.  The employee was not provided a cartridge changeout schedule prior to being required to wear the respirator.
Recent events (2)
  • — I (S) $0
  • — Z (S) $2000

1926.20 B02

Other-than-serious 1 instance 1 exposed
Issued
Nov 4, 2013
Abate by
Nov 8, 2013
Penalty
Initial $2,000 · Current $1,200 Reduced
29 CFR 1926.20(b)(2): Frequent and regular inspections of the job sites, materials, and equipment to be made by competent persons was not designated by the employer:     a) On or about 07/24/2013, at the job site, an inspection was not made by a competent person of the unstable building being demolished by heavy equipment operator.
Recent events (2)
  • — I (O) $1200
  • — Z (S) $2000

1926.100 A

Other-than-serious 1 instance 1 exposed
Issued
Nov 4, 2013
Penalty
Initial $2,000 · Current $1,400 Reduced
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets:     a) On or about 07/24/2013, at the job site, for the supervisor and laborer in the area of the demolition.  Employees on the ground were not wearing hard hats.
Recent events (2)
  • — I (O) $1400
  • — Z (S) $2000

View Ritter & Paratore Contracting, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339225310.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.